Laserfiche WebLink
13. Water Use. <br />73 <br /> Will the project involve installation or abandonment of any water wells, connection to or <br />74 <br />changes in any public water supply or appropriation of any ground or surface water <br />75 <br />(including dewatering)? Yes No <br />76 <br />If yes, as applicable, give location and purpose of any new wells; public supply affected, <br />77 <br />changes to be made, and water quantities to be used; the source, duration, quantity and <br />78 <br />purpose of any appropriations; and unique well numbers and DNR appropriation permit <br />79 <br />numbers, if known. Identify any existing and new wells on the site map. If there are no wells <br />80 <br />known on site, explain methodology used to determine. <br />81 <br />14. Water-related Land Use Management Districts. <br />82 <br /> Does any part of the project involve a shoreland zoning district, a delineated 100-year flood <br />83 <br />plain, or a state or federally designated wild or scenic river land use district? If yes, identify <br />84 <br />the district and discuss project compatibility with district land use restrictions. Yes <br />85 <br />No <br />86 <br />15. Water Surface Use. <br />87 <br /> Will the project change the number or type of watercraft on any water body? Yes <br />88 <br /> No <br />89 <br />If yes, indicate the current and projected watercraft usage and discuss any potential <br />90 <br />overcrowding or conflicts with other uses <br />91 <br />16. Erosion and sedimentation. <br />92 <br />Give the acreage to be graded or excavated and the cubic yards of s0il to be moved:____ <br />93 <br />acres____cubic yards. Describe any steep slopes or highly erodible soils and identify them <br />94 <br />on the site map. Describe any erosion and sedimentation control measures to be used <br />95 <br />during and after project construction. <br />96 <br />17. Water Quality - Surface Water Runoff. <br />97 <br />a. Compare the quantity and quality of site runoff before and after the project. Describe <br />98 <br />permanent controls to manage or treat runoff. Describe any stormwater pollution <br />99 <br />prevention plans. <br />100 <br />b. Identify routes and receiving water bodies for runoff from the site; include major <br />101 <br />downstream water bodies as well as the immediate receiving waters. Estimate impact <br />102 <br />runoff on the quality of receiving waters. <br />103 <br />18. Water Quality - Wastewater <br />104 <br />a. Describe sources, composition and quantities of all sanitary, municipal and industrial <br />105 <br />wastewater produced or treated at the site. <br />106 <br />b. Describe waste treatment methods or pollution prevention efforts and give estimates of <br />107 <br />composition after treatment. Identify receiving waters, including major downstream water <br />108 <br />bodies, and estimate the discharge impact on the quality of receiving waters. If the project <br />109 <br />involves on-site sewage systems, discuss the suitability of site conditions for such <br />110 <br />systems. <br />111 <br />c.If wastes will be discharged into a publicly owned treatment facility, identify the facility, <br />112 <br />describe any pretreatment provisions and discuss the facility's ability to handle the volume <br />113 <br />and composition of wastes, identifying any improvements necessary. <br />114 <br />PROJ0032_EAW_Waiver_RCA_120814.doc <br />Page 3 of 6 <br /> <br />