Laserfiche WebLink
B. <br />Discuss the effect on traffic congestion on affected roads and describe any traffic improvements <br />necessary. The analysis must discuss the projectÓs impact on the regional transportation system. <br />If the peak hour traffic generated exceeds 250 vehicles or the total daily trips exceeds 2,500, a <br />traffic impact study must be prepared even if an EAW is not required. Use the format and <br />procedures described in the Minnesota Department of TransportationÓs Access Management <br />Manual, Chapter 5 (available at: http://www.dot.state.mn.us/accessmanagement/resources.html) <br />or a similar local guidance, <br />C. <br />Identify measures that will be taken to minimize or mitigate project related transportation effects. <br />14.Cumulative potential effects <br />A. <br />Describe the geographic scales and timeframes of the project related environmental effects that <br />could combine with other environmental effects resulting in cumulative potential effects. <br />B. <br />Describe any reasonably foreseeable future projects (for which a basis of expectation has been <br />laid) that may interact with environmental effects of the proposed project within the geographic <br />scales and timeframes identified above. <br />C. <br />Discuss the nature of the cumulative potential effects and summarize any other available <br />information relevant to determining whether there is potential for significant environmental <br />effects due to these cumulative effects. <br />15.Other potential environmental effects: <br /> If the project may cause any additional environmental <br />effects not addressed by items 1 to 14, describe the effects here, discuss the how the environment <br />will be affected, and identify measures that will be taken to minimize and mitigate these effects. <br />16.Signature(s): <br /> By signing below, you attest that the information above and attached: <br />is accurate and complete to the best of your knowledge. <br />describes the complete project; there are no other projects, stages or components <br />other than those described in this document, which are related to the project as <br />connected actions or phased actions, as defined at Minnesota Rules, parts 4410.0200, <br />subparts 9c and 60, respectively. <br />Proposer printed name: _____________________________________ <br />Proposer signature: _______________________________________ Date: ___________________ <br /> <br />