Laserfiche WebLink
Marion Street / The Brittanys <br /> G & G Management, LLC <br /> Council Members April 6, 2015 <br /> City Of Roseville <br /> Roseville City Hall <br /> 2660 Civic Center Drive <br /> G & G Management is focused and proud to maintain all our buildings in good <br /> condition, meeting or exceeding all applicable codes for the safety of our tenants & <br /> office personnel. <br /> G & G Management believe in protecting the environment, which directly relates to <br /> the wellness and health of human beings and every other species. <br /> We are proud that we have spent over $35K and saved 2,379,000 Gallons of water <br /> over a 3 months period of July— Sep 2014 as compared to 3 months of July— Sep <br /> 2012, before improvements. California has water shortage at present & mandatory <br /> cuts in water consumption. <br /> We have replaced inefficient fluorescent lighting in the hallways & laundry rooms <br /> with most efficient LED lamps, thus reducing electrical consumption. Reduction of <br /> 71,610 KWH/yr in electrical consumption will prevent 73,759 Kg of CO2 going into <br /> atmosphere, thus helping "CLIMATE CHANGE" problem. (Assuming coal is used to <br /> produce electricity) And it will reduce 22,975 Kg of CARBON going into atmosphere. <br /> We know as per Mr. Don Munson, Codes Coordinator, Energy efficiency is not a <br /> primary focus of the licensing program, we strongly believe & recommend <br /> that it should be. <br /> 1. Management followed guidelines provided to us by City to correct all <br /> items in every unit. Our intent was to fix everything and be ready <br /> for inspection— <br /> ❑ Management inspected all units multiple times before inspection. <br /> ❑ Hired an electrician to go through all apartments, laundry rooms and <br /> common areas to check/repair/replace every electrical issue, smoke <br /> alarm, CO alarm, broken outlet/ switches. <br /> ❑ Hired a handyman to fix and/or replace all screens in all the buildings. <br /> ❑ Hired a paving company to install new 1735 Marion parking lot and <br /> resurfacing an existing 195 Larpenteur parking lot. <br /> ❑ Inspected and fixed all concrete side walks. <br /> ❑ In 7 buildings installed new flooring in common areas like hallways, <br /> stairways, and laundry room. <br />