Laserfiche WebLink
City of Roseville 2015 Fee Schedule <br /> E. Maximum fee on an apartment building shall not exceed $70.00 per dwelling <br /> unit. A two unit dwelling (duplex) maximum fee per unit as per single family <br /> dwelling. <br /> F. The fee for remote control/signal circuits is $0.75 per device. <br /> C. In addition to the above fees: <br /> 1) A charge of$1.00 will be made for each street lighting standard. <br /> 2) A charge of$7.00 will be made for each traffic signal standard. Circuits <br /> originating within the standard will not be used when computing fees. <br /> H. In addition to the above fees, all transformers and generators for light, heat and <br /> . et Al <br /> including 100 KVA. 101 KVA and over at $.30 per KVA. The maximum fee <br /> for any transformer or generator in this category is $80.00. <br /> be computed at $8.00. <br /> J. The fee for retro fit lighting is $0.65 per light fixture. <br /> K. In addition to the above fees, the inspection fee for each se:. . - - . . <br /> swimming pool shall be computed at $35.00. Reinforcing steel for swimming <br /> pools requires a rough in inspection. <br /> L. For the review of plans and specifications of proposed installations, there shall <br /> be a minimum fee of$150.00 up to and including $30,000 of electrical estimate, <br /> . ! <br /> 0, . .. - - cess of $30,000 to be paid by permit <br /> applicant. <br /> 1 1 <br /> any Court, a re inspection fee of $35.00 may be assessed in writing by the <br /> Inspector. <br /> N. For inspections not covered herein, or for requested special inspections or <br /> services, the fee shall be established separately. <br /> 0. For inspection of transient projects, including but not limited to, carnivals and <br /> circuses, the inspection fees shall be computed as follows: <br /> Power supply units according to Item "B" of fee schedule. A like fee <br /> will be required on power supply units at ach engagement during the <br /> season, except that a fee of$35.00 per hour will be charged for <br /> additional time spent by the Inspector if the power supply is not ready <br /> for inspections as required by law. <br /> 18 <br />