My WebLink
|
Help
|
About
|
Sign Out
Home
ord_1480
Roseville
>
City Council
>
City Council Ordinances
>
1400
>
ord_1480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2018 10:52:22 AM
Creation date
6/29/2015 4:00:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
6/22/2015
Ordinance #
1480
City Code Chapter Amendment
C314
Ordinance Date Passed
6/22/2015
Ordinance Date Published
7/7/2015
Publication Type
Ordinance
Publication Newspaper
Review
Publication Date (lst)
7/7/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2015 Fee Schedule <br /> , e a- - . -- <br /> • <br /> P. The fee is doubled if the work starts before the permit is issued. <br /> Residential panel replacement: $100.00 <br /> Residential sub panel: $40.00. <br /> Minimum Fee: Minimum permit fee is $40.00 plus $1.00 State surcharge. This is for one <br /> inspection only. Minimum fee for rough-in inspection and final is $80.00 plus $1.00 State <br /> surcharge. <br /> Maximum Fee: Maximum fee for single family dwelling or townhouse not over 200 amps is <br /> $175.00 plus $1.00 State surcharge. Maximum of 3 inspections. <br /> Apartment Buildings: Fee per unit of an apartment or condominium complex is $70.00. This <br /> does not cover service, unit feeders or house panels <br /> Swimming Pool: $80.00 plus circuits. This includes 2 inspections <br /> Additions, Remodels or Basements Finishes: $80.00 this includes up to 10 circuits and 2 <br /> inspections <br /> Accessory Structures: $50.00 for panel plus $8per circuit or $80 for 2 inspections. <br /> Traffic Signals: $7.00 per each standard <br /> Street and Parking Lot Lights: $4.00 per each standard <br /> Transformers and Generators: $10 up to 10KVA, $40 11 to 75KVA, $60 75KVA to 299 <br /> KVA, over 299 KVA is $150. <br /> Retro Fit Lighting: $.65 cents per fixture <br /> Sign Transformer: $8.00 per transformer <br /> Remote Control and Signal Circuits: $.75 cents per device <br /> Re-Inspection Fee in addition to all other fees: $40.00 <br /> Permit fee is doubled if the work is started before the permit is issued. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.