My WebLink
|
Help
|
About
|
Sign Out
Home
2015_0723_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_0723_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2015 9:01:10 AM
Creation date
7/16/2015 3:28:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RCA Exhibit A <br />• Is this a senior development? <br />RPCA Attachment D <br />o No, initially we referred to this housing type as senior townhomes, they will not have age <br />restrictions. However, the design of the home is very conducive for people looking for main <br />level living. (Floor plan overview and discussion.) <br />• Are there egress windows in the basement even if it's not being finished right away? <br />o Yes, there are two egress windows in every basement regardless of whether it's finished or not. <br />• Are there any restrictions — income, owner occupied (controlling rental), price? <br />o We will only sell to owner occupants initially. The association will limit the amount of rental, <br />but it will be allowed with a goal of responsible rental situations. <br />o It's fully market rate, no income restrictions. <br />o Prices are expected to start around $350,000 depending on location/finishes. <br />o GMHC would be interested in potential "house swaps" for homebuyers, where we would <br />purchase your home and rehab it for resale to an owner occupant. You wouldn't have to worry <br />about selling a home in order to get into a new one or need to make repairs prior to selling. <br />• Who will run the association? <br />o Ultimately, it will be a homeowner's association controlled by the homebuyers. We are <br />working with Community Development to set up and initially help run it, but once occupied the <br />homeowners can choose to continue with them or choose another option. <br />• Are there any anticipated improvements by the City/County in the surrounding area? <br />o Not that we're aware of at this time. <br />• Siding type? Will the association control the color? <br />o The siding is LP Smartside, lap siding that is painted. The association will have architectural <br />controls and reserves to maintain/repaint as necessary. <br />• How long before the landscaping is put in? Who assures that it is put in according to the plan? <br />o Landscaping is typically last to minimize the impact of the construction on the vegetation. <br />o The city and watershed district will require us to complete the landscaping — payments <br />withheld. Discussion of the raingardens that dominate the landscaping followed — their <br />purpose, how they are required, the watershed district's role, etc. <br />• Do you anticipate all existing trees will come down? Will you be planting/size? <br />o Unfortunately, yes due to the layout, stormwater requirements and construction damage they <br />will. We will be planting trees, not seedlings. <br />• Layout questions: <br />o Lot sizes? — they vary approximately 50'x100' (zero lot line explanation) <br />o Walking path in middle? — Yes, around the raingarden that will be dry except during high rains. <br />o Steps? — Right now there are steps to get in — we're working on design options to reduce when <br />needed. Drainage requirements are making zero-step entrance option impossible. <br />o Laundry location discussion. <br />• Do you have other developments in the area? Model home? <br />o We don't have true model homes, just examples of current work if available for potential <br />buyers to look at. We are working on a smaller development in Richfield. We do mostly <br />scattered site houses but plan on creating a model onsite and product samples before. <br />• What do you think was the main hold up? Will it happen again? What's the hold up now? <br />o For us, the previous plan had a lot of obstacles and site costs not previously anticipated to <br />control stormwater runoff, which led to troubles financing the project as originally proposed. <br />o The new plan is much simpler and can be done without as many problems, lower site costs, and <br />providing the housing type most in demand in Roseville. <br />o Right now we are going through the City's development process — the preliminary plat right <br />now that this meeting is a step towards, and expect to break ground in the fall. <br />Page 17 of 18 Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.