Laserfiche WebLink
<br />Demolition Permit Fee: <br />· Tenant improvement/remodeling prior to building permit <br />· Structures not connected to utilities <br />· Structures connected to city utilities <br /> <br />$50.00 <br />$50.00 <br />$100.00 <br /> <br />Electrical Permit Fee: <br />· Set through yearly contract with Contract Electrical Inspector <br /> <br />Fire Safety Inspection Fee: <br />· An amount equal to eight percent (8%) of the amount determined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237,3-13-2000, eff. 5-1-2000) <br /> <br />Gradinl!lExcavation Permit Fee: <br /> <br />G d' PI R' F <br /> <br />ra mg an eVlew ee <br />50 cubic yards or less....................................................................... ...No fee <br />51 to 100 cubic yards or less.............................................................. ....$23.50 <br />101 to 1,000 cubic yards. . . . . .. . . . .. . . . . .. . .. . . . .. .. . . .. . . .. .. . . . .. . . . . . . . . .. . . .. . . . . . . . .. . . .. $3 7 . 00 <br />1,001 to 10,000 cubic yards.............................................................. .....$49.25 <br />10,001 to 100,000 cubic yards - $49.25 for the first 10,000 cubic yards, plus $24.50 for each <br />additional 10,000 yards or fraction thereof. <br />100,001 to 200,000 cubic yards - $269.75 for the first 100,000 cubic plus $13.25 for each <br />additional 10,000 cubic yards or fraction thereof. <br />200,001 cubic yards or more - $402.25 for the first 200,000 cubic yards, plus $7.25 for each <br />additional 10,000 cubic yards or fraction thereof. <br />Other Fees: <br />Additional plan review required by changes, additions or revisions to approved plans <br />(minimum charge - one-half hour).. .................................. ...............$50.50 per hour <br /> <br />ra mg erml ee <br />50 cubic yards or less....................................................................... ...$23.50 <br />51 to 100 cubic yards.. . .... ... ..... ..... . ... . ..... .. . .. . ...... .. .... ... . ..... . ... .. .. . .. .... ..$37.00 <br />101 to 1,000 cubic yards - $37.00 for the first 100 cubic yards, plus $17.50 for each additional <br />100 cubic yards or fraction thereof. <br />1,001 to 10,000 cubic yards - $194.50 for the first 1,000 cubic yards, plus $14.50 for each <br />additional 1,000 cubic yards or fraction thereof. <br />10,001 to 100,000 cubic yards - $325.00 for the first 10,000 cubic yards, plus $66.00 for each <br />additional 10,000 cubic yards or fraction thereof. <br />100,001 cubic yards or more - $919.00 for the first 100,000 cubic yards, plus $36.50 for each <br />additional 10,000 cubic yards or fraction thereof. <br />Other Inspections and Fees <br />1. Inspections outside of normal business hours............................. .$50.50 per hour <br />(minimum charge - one-half hour) <br />2. Reinspection fees............... .... ..... ..... .......... ................ ..... ...$50.50 per hour <br />3. Inspections for which no fee is specifically indicated.................... .$50.50 per hour <br />(minimum charge - one-half hour) <br /> <br />G d' P 't F <br />