Laserfiche WebLink
<br />Investie:ation Fee: Work without a Permit <br />· Whenever any work for which a permit is required from the city has been commenced <br />without first obtaining said permit, a special investigation shall be made before a permit may <br />be issued for such work. An investigation fee, in addition to the permit fee, shall be collected <br />whether or not a permit is then or subsequently issued. The investigation fee shall be equal <br />to the amount of the permit fee required by this code. The payment of such investigation fee <br />shall not exempt any person from compliance with all other provisions of the city or state <br />codes nor from any penalty prescribed by law. <br /> <br />Manufactured Home Permit Fee: <br />· New installation <br /> <br />$150.00 <br /> <br />Mechanical Permit Fee: <br />· Residential <br />- Air conditioning - new <br />- Air conditioning - replacement <br />- Warm air furnace - new <br />- Warm air furnace - replacement <br />- Hot water boilers - new <br />- Hot water boilers - replacement <br />- Unit heaters <br />- Swimming pool heaters <br />- Miscellaneous work & gas piping <br />- Minimum fee <br />- Gas fireplace <br />· Commercial <br />- All commercial work <br /> <br />$35.00 <br />$35.00 <br />$75.00 <br />$40.00 <br />$75.00 <br />$40.00 <br />$40.00 <br />$40.00 <br />1.25 % of estimated job cost <br />$35.00 <br />$40.00 <br /> <br />1.25 % of estimated job cost <br /> <br />Movine: Permit Fee: <br />· Over private property only <br />· Over public streets <br />· Investigation fee <br /> <br />$50.00 <br />$100.00 <br />$50.50/hour <br /> <br />Plumbine: Permit Fee: <br />· Administrative/minimum fee <br />- Plus, for each fixture opening <br />· Miscellaneous work <br />· Backflow prevention verification <br /> <br />$35.00 <br />$8.00 <br />1.25 % of estimated job cost <br />$20.00 <br /> <br />Plan Review Fee: <br />· When a building permit is required and a plan is required to be submitted, a plan checking <br />fee shall be paid. Plan checking fees for all buildings, except for construction costs in R-1 <br />and R-2 zones which do not involve new single family structures and are ofless than fifteen <br />thousand dollars ($15,000.00), shall be sixty five percent (65%) of the building permit fee as <br />set forth in Section 901.06 of this chapter (of the city code), except as modified in M.S.B.C. <br />Section 1300. (Ord. 1110,4-13-1992) <br />