Laserfiche WebLink
.. There were some conversations about a possible pedestrian connection between the concrete <br />. pathway along the north side of Twin Lakes Parkway and the existing trail around Langton Lake. <br />.. Staff will explore some possible connections and work with staff from the Parks and Recreation <br />� department as well as the Parks and Recreation Commission to define that alignment. This would <br />� be a follow up to the roadway project but we would ]ook to install this connection in 2016 as <br />.: well. <br />., At this point staff is seeking approval from tbe City Council of the plans and also authorization <br />., to advertise the project for bids. The advertisement will be posted within the next two weeks <br />with a bid opening date set for mid to late September, based on the actual advertisement date. <br />After bids are opened, staff anticipates presenting the winning bid to the City Council for <br />��� approval to award a contract likely at the October 5, 2015 City Council meeting. This would <br />� represent the last Council action prior to construction of the roadway. <br />�_�� Construction would start this fal] with the demolition of the Hagan building within the roadway <br />right-of-way and some work related to soil remediation could occur over the winter, at the <br />��-: contractor's discretion. The project will have a required substantial completion date of August 1, <br />� 2016. <br />The estimated cost of the roadway project is $2.3 million. <br />POLICY OBJECTIVE <br />�� The Twin Lakes project has long been identified as a priority for the City. This project would <br />�, complete the extension of Twin Lakes Parkway and is consistent with the original Master Plan <br />. for the Twin Lakes area, the Twin Lakes Business Park AUAR as originally adopted in 2001 and <br />� the City's Comprehensive Plan. <br />5 FINANCIAL IMPACTS <br />�� This project will be funded with bonds from the TIF 13 district. The estimated cost of the project <br />� is $2.3 million. <br />'. STAFF RECOMMENDATION <br />. Staff recommends the Council approve plans for the Twin Lakes Parkway Phase 3 Project and <br />. authorize staff to advertise for bids. <br />t;' REQUESTED COUNCIL ACTION <br />c� Motion to approve plans for the Twin Lakes Parkway Phase 3 Project and authorize staff to <br />advertise for bids. <br />Prepared by: Marc Culver, Public Works Director <br />Attachments: A: Project layout <br />B: Twin Lakes Pkwy Phase 3 Open House Display Boards <br />C: Comments from July 30 Open House <br />Page 2 of 2 <br />