Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Schedule <br />o Status: We are designing options for a project and assessing the environmental impacts <br />(environment.html) of a project. <br />Construction timeline is dependent on funding. <br />Location <br />o I -35W between Hwy 36 in Roseville and Lexington Avenue in Blaine <br />Related studies <br />o Previous study completed at this location <br />(http://www.dot.state.mn.us/metro/proiects/iatwstudy/index.htn l) <br />Nearby projects <br />o I-.qr;W between Hwyg6 and I -6e4 (/metro/proiects/i�swardenhffls/index.html) <br />Connect with us <br />Email updates (http: //visitor.r2o.constantcontact.com/d.isp?Ilr=pehis8bab&p=of&m=llot.r;io48.o87&sit=vrwm7lacb) <br />Follow us on Facebook (http://www.faceboo]Lcom/pages/Minnesota-Deparbnentof-Transportation/is.7g.482248) <br />Follow us on Twitter (/socialmedia/index.html) <br />Get Connected: Answers to your auestions about transportation funding (http:/Avww.d(yt.gtate.13M.us/lzetconnectedf) <br />