Laserfiche WebLink
DepartmentProjectPriority <br />2001Total <br />2002200320042005 <br />Streets <br />5 Ton Utility Trailer cost)1 <br />Replace Aerial Lift Truck Parks)1 90,000 <br />Broom Attachment for Skids-01-003 1 <br />Replace Three Ton Dump Truck s-01 -004 1 <br />Replace Ton Pickup gate 11s-01 -005 1 <br />24,000 <br />Replace Three Ton Asphalt Roller <br />S-01-006 1 <br />1 <br />Concrete/Asphalt Pavement Saw s-02-001 <br />4x4 Pickup <br />s-02-002 1 <br />Sign Truck Chassis <br />S-02-003 1 <br />Used Seal-Coat Chip SpreaderS-02-004 1 <br />50,000 <br />Self-Propelled Paver (Split cost w/other cities) <br />s-02-005 1 75,00075,000 <br />3 Ton Dump w/Snow Equipment <br />s-03-001 1 95,000 <br /> Ton Pickup s-03-002 1 <br />25,000 <br />3 Ton Dump w/Snow Equip. s-03-063 1 <br />100,000 <br />Road Grader s-03-004 <br />1 <br />Replace Pavement Router s-03-005 1 <br />Replace Wheel Loader 01 <br />s-04-001 1 125,000 <br />Replace Dump Truck w/Snow Equipment <br />s-04-062 1 <br />Replace Oil Distribution Body s-04-003 <br />1 75,000 <br />Replace Dump (tandem) <br />s-05-061 1 <br />125,000 <br />Replace Skid steer Loader w/attachments 19S-05-002 <br />1 <br />Replace Wheel Loader w/plow equipment <br />s-05-063 1 <br />140,000 <br />Replace trailer cost) <br />s-05-004 1 <br />Replace Meter <br />s-05-005 1 25,000 <br />Replace Portable Line Striper 43 <br />s-05-066 1 <br />Streets Total <br />265,000205,000430,000310,000335,000 <br />v-19 <br /> <br />