Laserfiche WebLink
20022004 <br />DepartmentProjectPriority200120032005Total <br />Water <br />Quick Coupler for Backhoe cost)1 <br />PMP Water main Replacement 1 30,000 <br />Booster Station ImprovementsWA-01-003 1 70,000 <br />Automated Meter Reading 1 40,000 <br />Cost of Service StudyWA-01 -005 1 60,000 <br />Water MetersWA-01-006 <br />1 35,000 <br />Automated Meter Reading-Large Meters 1 200,006 <br />PMP Water main ReplacementWA-02-002 1 30,600 <br />Water Truck cost)1 35,000 <br />Water Meter Replacement <br />WA-02-004 1 <br />1 <br />Asset Management SoftwareWA-02-005 <br />PMP Water main ReplacementWA-03-002 1 <br />Water Meter ReplacementWA-03-004 1 40,000 <br />Replace 4 WD Pickup w/Plow WA-04-001 <br />1 26,000 <br />Main Replacement 1 50,000 <br />Water Meter ReplacementWA-040041 <br />Replace Repeater Radio cost)WA-040051 <br />SCADA Radio improvementsWA-060061 <br />Elevated Storage Tank InspectionsWA-050011 <br />PMP Water main ReplacementWA-05-0021 <br />Water Meter ReplacementWA-050031 <br />Water Total <br />255,85070,000 122,000 82,500 840,350 <br />Wireless <br />Wide Area Network Replacementw-02-001 10,000 <br />Wireless Total <br />10,000 <br />GRAND <br /> <br />