My WebLink
|
Help
|
About
|
Sign Out
Home
2015-09-22_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2015
>
2015-09-22_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2015 10:07:05 AM
Creation date
9/18/2015 10:04:56 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/22/2015
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: September 22, 2015 <br />Item Description: Communication Items <br />Projects update: <br />• Victoria Street Reconstruction and Sidewalk Project <br />• All concrete work is completed. <br />• Disturbed areas are being seeded and sodded currently <br />• Schedule to pave final lift September 24 and 25. <br />Item No: 4 <br />• Scheduled to place pavement markings the week of September 28 <br />• Project still scheduled to be completed by October 2. <br />• Pavement Maintenance Program <br />• Watermain work has been started on Draper and Ryan. Scheduled to be <br />completed near end of September. <br />• Scheduled to mill and overlay Wheeler St., Herschel St., Aldine St. and Charlotte <br />St. starting the week of September 21. <br />• Contractor will begin storm sewer work on Chatsworth St and Millwood Ave. <br />starting the week of September 21. <br />• Pipe busting work on Roselawn is progressing. Road closure to thru traffic is in <br />effect. Watermain work will be completed by September 30 at which time <br />pavement work will begin. <br />• Lift Station Replacements <br />• The Wagner Sanitary Sewer lift station work has begun and should be installed by <br />September 25. Lift station is scheduled to be put online near end of October. <br />• Site work on the St. Croix storm water lift station will begin in mid-October. <br />Major work will begin once pumps and panels are in. <br />• 2015 Drainage Improvements <br />• Work scheduled to begin September 21. <br />• Catch basin work on County C2 <br />• Backyard drainage near 2195 Marion <br />• Inlet improvements at Bennet Lake Inlet <br />• Twin Lakes Parkway <br />• Scheduled to open bids on September 30, 2015. <br />• 35W & Cleveland Interchange <br />• Contracts signed. Forest Lake Contracting will likely due this work in Spring <br />2016 <br />• Water Meter Replacement Project: <br />• Ferguson is continuing to replace meters in area 2, southeast section of the City, <br />and are about 90% completed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.