Laserfiche WebLink
• They have begun work on Area 3, northeast section of the city, and are about 20% <br />completed. <br />• Their deadline is 12/31/15 and are committed to completing this project on time. <br />Maintenance Activities: <br />• Continuing with miscellaneous street and pathway patching <br />• Central Park/Victoria Ballfields <br />• Started the 6u' mowing of City right of ways <br />• Sign maintenance <br />• The 2015 sewer cleaning program is continuing. <br />• Continued replacing water meters in Area 1. Approximately 65 left. <br />• Repaired watermain leak at 2644 Lexington. <br />• Inspected all storm water ponds and checked for proper operation during the rain event <br />on September 17. <br />• No issues with any of the stations <br />Attachments: <br />Attachment B - Meter Replacement Map <br />Attachment C — 2015 Project Map <br />Attachment D — 2015 Utilities Map <br />