Laserfiche WebLink
Mr. Marcus Culver 2- September 28, 2015 <br />For construction, SRF will be responsible for Contractor oversight/observation of removals, grading, <br />drainage, storm sewer, city utilities and stabilization. We understand that this project will use local <br />funding and potentially State Aid funding and therefore, will require a high level of detail and accuracy <br />in quantiry documentation and construction observation. <br />We, at SRF, understand that in order to complete a successful project, the correct team of <br />professionals must be available to complete all project tasks. We will plan to staff this project with <br />inspectors and testers that have MnDOT technical certifications, and are familiar with MnDOT <br />inspection procedures and the MnDOT State Aid for Local Transportation Schedule of Materials <br />Control. <br />The Engineer of Record will be available to help our field staff with questions during construction. <br />Resumes of project personnel can be provided at your request. <br />SCOPE OF SERVICES <br />We propose to carry out the work as described in the attached detailed Work Task and Person Hour <br />Estimate and will generally include the following tasks: <br />Project Management <br />Topographic Survey and Data Collection <br />Utility Coordination <br />Preliminary and Final Design <br />0 30% Concepts <br />0 60% Plans and Estimate <br />0 90% Plans, Specification and Estimate <br />0 100% Plans, Specification and Estimate <br />Permitting <br />Bidding Administration <br />Construction Administration <br />Construction Observation <br />Construction Survey <br />As-Built Plans <br />Optional Right of Way Acquisition <br />