Laserfiche WebLink
9/28/2015 <br />SRF Consulting Group, Inc. <br />Client: CITY OF ROSEVILLE <br />Project: TERRACE LANE AT LINCOLN LANE REALIGNMENT, LINCOLN LANE TO <br />SNELLING AVE REALIGNMENT; SIGNAL MODIFICATION AT SNELLING <br />AVENUE <br />Subconsultants: <br />TASK N0. SUMMARY OF TASKS <br />1.0 PROJECT MANAGEMENT <br />2.0 DATA COLLECTION & UTILITY COORDINATION <br />3.0 PRELIMINARY DESIGN <br />4.0 FINAL PLANS, SPECIFICATIONS AND ESTIMATE (PS&E) <br />5.0 PERMITTING <br />6.0 CONSTRUCTION STAKING <br />7.0 CONSTRUCTION STAKING <br />8.0 CONSTRUCTION OBSERVATION <br />9A FINAL INSPECTION AND ACCEPTANCE <br />10.0 AS-BUILTS <br />Work Tasks and Person-Hour Estimates ��;� � <br />Consulting.. Grnup, Inc�. <br />P14 XXXX <br />Proiect Overview: <br />The project overview should provide information pertinent to the intent of the project and help define project outcomes. <br />Items to be considered are: Existing Conditions, Funding Sources, Anticipated Proposed Conditions, Standards to be <br />Applied, Timeline/Schedule <br />Page 1 of 13 <br />LWCOLN-SNELLING 2-Hrly_Tasks.xlsx <br />SRF CONSULTING GROUP, INC. ENGINEERS AND PI.ANNERS MINNEAPOLIS. MN <br />