My WebLink
|
Help
|
About
|
Sign Out
Home
2015_1005_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_1005_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2015 4:07:06 PM
Creation date
10/1/2015 2:35:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/28/2015 <br />SRF Consulting Group, Inc. Work Tasks and Person-Hour Estimates <br />Client: CITY OF ROSEVILLE <br />Project: TERRACE LANE AT LINCOLN LANE REALIGNMENT, LINCOLN LANE TO <br />SNELLING AVE REALIGNMENT; SIGNAL MODIFICATION AT SNELLING <br />AVENUE <br />TASK N0. TASK DESCRIPTION <br />Assumptions: <br />- A feasbility study will not be required for this project. <br />- Plan preparation assumes Local funding only. <br />Project duration: from authorization to proceed to construction completion <br />(October 2015 to September 2017). <br />Design Phase: 2016 <br />- Bidding Phase: March 2017 through April 2017 (2 weeks to excecute CDs) <br />- Construction Phase: Staffed May 1, 2017 through September 1, 2017 <br />Construction assumed to be May 1, 2017 through August 1, 2017. <br />1.0 PROJECT MANAGEMENT <br />Assumptions: <br />- Project management will include work necessary for communication and <br />completion of the project tasks on time and within budget. <br />Client Deliverables: <br />- Scheduling MnDOT coordination meetings. <br />1.1 Perform day to day Project Management & Administration. <br />1.2 Ongoing phone and email communications and coordination with city staff <br />duringthe duration ofthe project. <br />1.3 Quality Assurance/Quality Control ("QA/QC'). SRF will perform QA/QC functions <br />throughout the Project duration to ensure delivery of a quality product in <br />accordance with the Project Schedule. <br />1.4 Meetings: Assume 3 coordination meetings with City staff at City Hall; includes <br />kick-off meeting. (2 hours each includes travel time) <br />1.5 Attendance at coordination meeting with MnDOT (assume 1 mtg, includes travel) <br />SUBTOTAL-TASK 1 <br />2.0 DATA COLLECTION & UTILITY COORDINATION <br />Assumptions: <br />Supplementing mapping in non-critical areas using GIS or digitizing aerial <br />imagery is considered sufficient level of detail. Critical areas will be surveyed. <br />Client Deliverables: <br />Provide record drawings for developed areas of the project. <br />����� <br />Consulting Group, Inc. <br />P14 XXXX <br />PRINCIPAL SR. ASSOC. ASSOCIATE SR. PROF PROF. TECHNICAL CLERICAL TOTALS EST. FEE <br />2 <br />0 <br />0 <br />0 <br />0 <br />2 <br />10 <br />10 <br />10 <br />6 <br />3 <br />39 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />2 <br />0 <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />12 <br />10 <br />10 <br />8 <br />3 <br />43 <br />Page 2 of 13 <br />$1.810 <br />$1,430 <br />$1,430 <br />$1,030 <br />$429 <br />$6,129 <br />LWCOLN-SNELLING 2-Hrly_Tasks.xlsx <br />SRF CONSULTING GROUP, INC. ENGINEERS AND PI.ANNERS MINNEAPOLIS. MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.