My WebLink
|
Help
|
About
|
Sign Out
Home
2015_1005_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_1005_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2015 4:07:06 PM
Creation date
10/1/2015 2:35:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/28/2015 <br />SRF C It' G I W k T k d P H E Y t <br />Page 10 of 13 <br />onsu ing roup, nc. or as s an erson- our s ima es �� `� � <br />Client: CITY OF ROSEVILLE <br />Project: TERRACE LANE AT LINCOLN LANE REALIGNMENT, LINCOLN LANE TO <br />SNELLING AVE REALIGNMENT; SIGNAL MODIFICATION AT SNELLING Consulting Group, Inc. <br />AVENUE <br />P14 XXXX <br />TASK N0. TASK DESCRIPTION PRINCIPAL SR. ASSOC. ASSOCIATE SR. PROF PROF. TECHNICAL CLERICAL TOTALS EST. FEE <br />8.0 CONTRACTADMINISTRATION 10 25 0 150 0 0 5 190 $19,305 <br />Project Engineer - IOhours/week for 19 weeks = 152 hours <br />- Conduct Preconstruction conference <br />- Maintain a complete and accurate record of activities and events <br />relatingto the project. <br />Phonelogs <br />Record of ineeting <br />Correspondence <br />Project time <br />Log of shop drawings and other submittals <br />- Prepare monthly pay voucher <br />Check Item Record Account entries <br />- Contract document interpretation and modifications <br />Provide contract document interpretations to the construction <br />Contractor <br />Analyze possible extra work (make recommendations to the <br />Cities Project Manager) <br />Negotiate prices with the Construction Contractor <br />Maintain accurate records of Force account work <br />Prepare work orders, change orders, and supplemental agreements <br />- Monitor construction contractors compliance with the Project schedule <br />Monitor applicable permit requirements <br />- Conduct weekly meetings (if necessary) <br />Conduct and document field reviews of maintenance of traffic operations <br />- Provide public affairs information and assistance <br />SUBTOTAL-TASK 8 10 25 0 <br />9.0 FINAL INSPECTION AND ACCEPTANCE 0 2 0 <br />- Perform final inspection <br />Prepare final punch-list <br />- Prepare final inspection letter <br />- Recommend final acceptance <br />- Prepare final pay voucher <br />SUBTOTAL-TASK 9 0 2 0 <br />150 0 <br />8 0 <br />8 0 <br />0 5 <br />8 1 <br />S 1 <br />190 $19,305 <br />19 $2,192 <br />19 $2,192 <br />LWCOLN-SNELLING 2-Hrly_Tasks.xlsx <br />SRF CONSULTING GROUP, INC. ENGINEERS AND PI.ANNERS MINNEAPOLIS. MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.