My WebLink
|
Help
|
About
|
Sign Out
Home
2015-11-05_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2015
>
2015-11-05_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2015 11:44:22 AM
Creation date
11/25/2015 11:44:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
99willing & capable leaders in place to help sustain Renewal Program Natural Resource <br />100Restoration efforts. <br />101 <br />OTHER <br />1029. <br />103Jamie Becker-Finn informed the Commission of a discussion taking place on <br />104Nextdoor.com on concerns for safety while walking along Victoria. Those living in the <br />105area are looking for a ways to make is safer – possibly a path that connects to parks and <br />106other arteries in the area. <br />107Heikkila asked about possible feedback being collected in the B2 pathway. <br />o <br />108Newby inquired into the Commissions role in Victoria’s safety concerns. Brokke <br />o <br />109added the need to take these concerns to the Public Works Director <br />110Roseville resident, Ellie Mattura, joined the table to share her communications with <br />111Ramsey County Public Works and hopes that involvement by Roseville Public Works <br />112may help move a pathway project on Victoria forward. <br />113 <br />114Meeting adjourned at 8:05 pm <br />115 <br />116Respectfully Submitted, <br />117Jill Anfang, Assistant Director <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.