My WebLink
|
Help
|
About
|
Sign Out
Home
2015_1207_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_1207_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2015 3:03:26 PM
Creation date
12/3/2015 2:35:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />City of Roseville <br />12-7-15 <br />Page 2 <br />This draft is organized as follows: <br />(A) Purpose and Intent — This is the section that tells potential applicants what the City wishes to <br />achieve through the PUD process, and sets the stage for future decision making on what is an <br />acceptable PUD. We have identified a number of potential over-arching goals that we are seeking <br />feedback on at this time. <br />(B) Initiation of Proceedings — Rather than reinvent the wheel, we are simply following standard <br />language found throughout the Roseville ordinance to explain how the PUD process can be initiated. <br />(C) Reflection on the Official Zoning Map — As recommended, we have crafted the language in this <br />section to adopt PUD's via an overlay district rather than as a stand-alone zoning district. This <br />ensures that underlying zoning standards will still be applicable unless specifically amended by the <br />overlay district. Approaching PUDs this way ensures that the City will be protected if any details are <br />missed during the development review process. <br />(D) Permitted Locations for PUD rezoning — As requested, PUDs would be allowed for all types of <br />development in all districts under this draft language. <br />(E) PUD Qualifications — We are recommending that any land proposed to develop as a PUD be under <br />single ownership or under control of a corporation, partnership or other legal entity that can fulfill the <br />obligations of the PUD process. Likewise, we are recommending that PUDs be a minimum of two (2) <br />acres in size unless it can be demonstrated that a project of superior design can be achieved or that <br />greater compliance with the comprehensive plan goals and policies can be attained through use of <br />the PUD process on a smaller parcel. <br />(F) Permitted Uses within a PUD — In this section, we restrict uses to those that are allowed by <br />underlying zoning, but leave the door open for new uses if the Community Development Department <br />deems that such a new use is "substantially similar" to an allowed use. This ensures that new <br />industries seeking a home in Roseville could potentially do so via PUD even if their specific use isn't <br />defined in code. Also addressed is the specialization of uses within a PUD. Whereas subdivision (a) <br />states that uses will be limited to those allowed by underlying zoning, subdivision (b) grants the City <br />flexibility to tailor use restrictions to the PUD site and surroundings. For example, current Roseville <br />codes state that "no commercial transactions" can occur at a mini-storage facility. This provision <br />could potentially allow someone to propose a mini-storage facility that includes a management <br />office, sale of boxes and moving equipment, etc. The "use" hasn't changed, but the general <br />regulations governing the use were tailored specifically for the site. Protection against impacts to the <br />surrounding properties are built into the review process to ensure that such changes are appropriate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.