Laserfiche WebLink
Attachment C <br />127 (i) Sustainability Improvements <br />128 �Multiple sustainability techniques �are incorporated into the development plans <br />129 including but not necessarily limited to: <br />130 <br />131 <br />132 <br />133 <br />134 <br />135 <br />136 <br />137 <br />138 <br />L Implementation of high quality construction standards and the use of high quality <br />construction materials to ensure the longevity of the proposed project; <br />2. Improvements to reduce the project's energy load, incrcase energy efficiency, <br />and maximize the use of renewable energy sources; <br />3. Inclusion of facilities to reuse or recycle water for on-site uses such as irrigation; <br />4. Enhancement of Indoor Environmental Quality (IEQ) by maximizing inCeriar <br />daylight, investment in appropriate ventilation and moisture control, occupant <br />control over systems such as lighting and temperature, and avoidance of <br />materials with high-VOC emissions. <br />139 (ii) Improved Storm Water Management <br />140 Where appropriate, maximizing the use of ecologically-based approaches to storm <br />141 water management, restoration or enhancement of on-site ecological systems, and <br />142 protection of off-site ecological systems through the application of Low Impact <br />143 Development (LID) practices. <br />144 (iii) Enhanced Buffering <br />145 Along property lines that abut different use types, limplementation of two lor more of <br />146 the following techniques: <br />147 <br />148 <br />149 <br />150 <br />151 <br />152 <br />153 <br />1. Significant vegetative screening and maintenance of existing vegetation if <br />possible and appropriate; <br />2. Increased setbacks; <br />3. Inclusion of berms, walls, fencing, ar a combination of such. <br />(iv) Structured Parking <br />Inclusion of structure parking to minimize land area dedicated to vehicles thereby <br />maximizing uses elsewhere on the property. <br />Comment [BGA17]: Wc did not put a <br />specific number on this goal as we wanC to <br />push projects to be as sustainable as possible, <br />but not be overly resn ictive such that the <br />invesrtnents to achiave the goal become cost- <br />prohiUitive. Saying "multiple" sustainability <br />tcchniques are needed prcvents an applicant <br />from doing something small lilce using locally <br />sourced products as their aigument that the <br />goal is met. We can continue to mull over a <br />more objective threshold should such be <br />desired by the City Com�cil. <br />/ Comment [BGA18]: For this category, we <br />are recommending a minimum of two <br />techniques be employed to qualify the <br />buffering as "euhanced." Additional <br />techniques can be added if desired. <br />/ Comment [BGA19]: Subsection (9) <br />154 (9) �PUD Review Proeedure� encompasses the overall PUD review process <br />which will require four steps: 1) Dcveloper <br />155 All requests to establish a Planned Unit Development overlay district shall be initiated by Open IIo�se, 2) PUD Concept Plan, 3) PUD <br />Preliminary Plan, and 4) PUD Final Plan. <br />156 following the steps below. <br />Page 5 of 13 <br />