My WebLink
|
Help
|
About
|
Sign Out
Home
2016-01-26_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-01-26_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2016 3:00:49 PM
Creation date
1/21/2016 2:16:35 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/26/2016
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thirty-two and ninety-six gallon carts of similar design shall be <br />provided to residents who request a different level of service. <br />Additional carts will be provided at no extra charge to residents who <br />request them. <br />The cart manufacturer selected by the City under a separate <br />procurement process shall be responsible for preparing a <br />comprehensive cart rollout plan and schedule for the initial cart <br />distribution. This cart roll-out plan shall include: <br />1. Final cart, label and logo specifications (including details of <br />cart color, lid color, and draft content of any label <br />instructions) to be proposed by the Contractor and approved <br />by the City. <br />2. Cart order quantity (including specified overage to have in <br />stock as excess inventory). <br />3. Contractor's plan for cart roll-out to customers, including <br />start and end dates. <br />The Contractor will work with the City to create the educational <br />materials for distribution to customers. <br />At a minimum, the educational materials must have the following <br />items: <br />1. Single stream system instructional brochure for customers. <br />2. Single stream system instructions (text and images) for the City's <br />website and newsletters. <br />Cart rollout, or an approved cart rollout plan, shall be completed by <br />the Contractor, no later than December 30, 2016. The Contractor <br />shall provide initial distribution of single stream carts to customers, <br />whether carts are owned by the City or the Contractor <br />5.05. Collection <br />Multi -unit dwellings <br />Contractor shall empty all acceptable materials from inside the <br />containers and acceptable materials that may be set adjacent to the <br />containers. After emptying the containers, the Contractor shall return <br />the containers to their appropriate locations. <br />Multi -unit dwellings shall receive service once a week unless a <br />different service frequency is agreed to by the City, the property <br />owner, and the Contractor. The City does not regulate the day of the <br />week Multi -unit dwellings shall receive service. Contractor shall <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.