Laserfiche WebLink
means identified by the City. Collection will be made the following <br />business day. <br />5.13. Weighing of Loads <br />Contractor will keep accurate records consisting of the date, time, <br />collection route, driver's identification, vehicle number, tare weight, <br />gross weight, net weight, and number of recycling stops for each <br />loaded vehicle. Collection vehicles will be weighed empty before <br />collection to obtain a tare weight and weighed after completion of a <br />route or at the end of the day, whichever occurs first. These records <br />shall be maintained on file by the contractor for at least three years in <br />the event of an audit by the City or County. <br />5.14. Ownership <br />Ownership of the recyclables shall remain with the person placing <br />them for collection until Contractor's personnel physically touches <br />the recyclables for collection, at which time ownership shall transfer <br />to the Contractor. <br />5.15. Scavenging Prohibited F4 <br />Any person or persons taking recyclable materials from a recycling <br />container without explicit permission of the inhabitant of a <br />residential dwelling unit or the owner or manager of a Multi -unit <br />dwelling Complex will be in violation of local ordinance (City Code <br />403.03) and subject to penalty. The Contractor shall report to the <br />City any instances of suspected scavenging or unauthorized removal <br />of recyclable materials from any collection containers. <br />Contractor will immediately report all witnessed scavenging to <br />Roseville's Police dispatch at 651-767-0640. <br />5.16. Utilities <br />The Contractor shall be obligated to protect all public and private <br />utilities whether occupying street or public or private property. If <br />such utilities are damaged by reason of the Contractor's operations, <br />under the executed contract, he/she shall repair or replace same, or <br />failing to do so promptly, the City shall cause repairs or replacemenl <br />to be made and the cost of doing so shall be deducted from payment <br />to be made to the Contractor. <br />22 <br />