Laserfiche WebLink
Hwy 280 <br />St Paul, Lauderdale and Roseville <br />Traffic impacts <br />About this project <br />Summary of work <br />• Repair and resurface northbound and <br />southbound Hwy 280 and shoulders between <br />Como Avenue and 1-35W <br />• Rebuild the ramps between Hwy 280 and I - <br />35W and add zipper merge signs for the <br />ramp from northbound Hwy 280 to 1-35W <br />• Rebuild approach roadway to the Hwy 280 <br />bridge over Como Avenue <br />• Construct concrete median barrier <br />• Install new guardrail north of Larpenteur <br />Avenue <br />• Improve storm sewer system and ponds <br />along Hwy 280 <br />Cost <br />• Approximately $3.3 million (estimated) <br />Schedule <br />• May - July 2016 <br />Location <br />• The ramps between Hwy 280 and 1-35W will <br />be closed and detoured for a portion of the <br />• Hwy 280 between Como Avenue to 1-35W in St. <br />project. This will require closing Hwy 280 <br />Paul, Lauderdale and Roseville <br />north of Broadway Street (6 weeks). Hwy <br />Benefits <br />280 will be detoured. <br />• Improves safety and reduces congestion by <br />• Hwy 280 will remain open to a single lane of <br />improving the layout of the ramp from <br />traffic in each direction south to Broadway <br />northbound Hwy 280 to northbound 1-35W <br />Street. <br />• Increases safety by replacing guardrail and <br />• The ramp from northbound Hwy 280 to <br />adding concrete median barrier <br />northbound I -35W will be open during Rondo <br />Days in St. Paul on July 16th <br />• Provides smoother ride <br />• Ramps at Como Ave and Larpenteur Ave will <br />• Improves drainage <br />close and be detoured during nearby work on <br />• Extends service life of roadway, bridges and <br />Hwy 280. <br />drainage system. <br />