Laserfiche WebLink
Hwy 36 at Lexington Avenue <br />Roseville <br />Traffic impacts <br />MW M <br />lerm`ton Ao Bridge Replacement <br />Hwy 36 Lexington Ave Bridge Replacement. <br />• Lexington Avenue will be closed and <br />detoured for a portion of the project (4 to 5 <br />months) <br />• Hwy 36 traffic will be maintained two lanes in <br />each direction and shifted onto a temporary <br />bypass. <br />• Lexington Avenue ramps will close <br />(westbound 3-4 months, eastbound 6 <br />months) <br />• Westbound ramps at Hamline Avenue will <br />close (4-6 weeks) <br />• Westbound ramp from Dale Street to Hwy 36 <br />will close (3-4 months) <br />More detailed schedule of project staging <br />About this project <br />Summary of work <br />• Replace the current structurally deficient Hwy <br />36 bridge with two new bridges to carry <br />eastbound and westbound Highway 36 traffic <br />• Reconstruct and resurface the ramps at <br />Lexington Avenue and the westbound ramps <br />at Hamline Avenue <br />• Reconstruct and resurface Hwy 36 between <br />Hamline Avenue and Victoria Street <br />• Replace the two signal systems at the <br />Lexington Avenue ramps <br />Cost <br />• Approximately $12 million <br />Schedule <br />• Construction: Begins 2016 <br />Location <br />• Hwy 36 between Hamline Avenue and Victoria <br />Street North in Roseville <br />Benefits <br />• Improves safety and reduced congestion by <br />improving the highway layout and ramps at <br />Lexington Avenue <br />• Provides smoother ride <br />• Improves drainage <br />• Extends service life of roadway, bridges and <br />drainage system. <br />• Upgrades signals and pedestrian crossings to <br />ADA (Americans with Disabilities Act) standards <br />at Lexington Ave ramps <br />