Laserfiche WebLink
Public Works Director Culver and City Engineer Jesse Freihammer provided <br />additional comments and a brief review and update on projects and maintenance <br />activities listed in the staff report dated October 27, 2015. <br />Discussion included location of lift station replacements; jurisdictional designation <br />and maintenance by Metropolitan Council for the gravity -fed sewer system trunk <br />lines traversing the City of Roseville servicing Roseville and other metropolitan <br />communities; impacts to Villa Park with scheduled Metropolitan Council sewer <br />system upgrades; continuing downtrend in participants in this last year for the <br />residential curbside leaf pick-up program; and ongoing drop in prices of LED light <br />bulbs with fixture replacement and/or retrofit remaining the main cost and <br />depending on their type and/or age. <br />Mr. Culver reported that an average of fifteen residents had attended the October <br />session of Roseville University, focusing on public works and engineering <br />departments. <br />Further discussion ensued regarding the Victoria Street project; rational for location <br />of the striped parking lane on the northbound side but lack of shoulder and striping <br />at the curb line on the southbound side and bicycle traffic would be safely <br />accommodated; explanation of erosion -control devices used to dissipate water flow <br />until vegetation is more established at which time they'll be removed; and rationale <br />for curb and gutter installations of different types along the Victoria Street corridor <br />depending on resident feedback and areas with or without well-defined ditches and <br />grade sufficient for drainage for rural section road design rather than a more urban <br />approach where stormwater management requirements needed to be met. <br />Additional discussion included parking along that corridor, with an 8' wide <br />shoulder available on both sides. <br />At the request of Chair Stenlund, Mr. Culver assured him that staff would monitor <br />the Capitol Region Watershed District's scheduled work yet this fall on the <br />interceptor line near the B -Dale Club to ensure the City's investment in drainage <br />management in that area was not negatively impacted. <br />5. 2016 Utility Rate Proposal <br />Chair Stenlund introduced and welcomed Finance Director Chris Miller for the <br />PWETC's annual review of proposed the 2016 utility rates based on staffs <br />preliminary analysis and before subsequently presenting that information to the <br />City Council as part of the 2016 budget process. <br />Details of Mr. Miller's presentation were provided and referenced by Mr. Miller in <br />the staff report and his memorandum both dated October 27, 2015. Mr. Miller <br />reviewed each of the enterprise funds and their operational review as part of staffs <br />analysis of utility operations including fixed and variable costs, capital replacement <br />costs, and customer counts and consumptions patterns, rate structure and rates. <br />Overall, Mr. Miller advised that staff anticipated a 1.5% average increase for most <br />Page 3 of 18 <br />