Laserfiche WebLink
303.900 Insulation <br />300-15 <br />The insulat3on shall be placed betwe�n tbe atorm seWer or storm �eWer <br />structure and the uatermain or serviae pipe. The in�ulation staall be <br />placed 3n two l.ayers, eacl� layer on.e-iaeb (1'�} thiek, xith the joir►�s <br />in the upper layer offset 1/2 baard Width i'rom the loWer layer. The <br />insui�tian ahali be held in plac� to prevent movement during backfill <br />bY 1/� ia��h diameter by �ix-inch (6") long wood doWels driven thr�ugh <br />eaeh eorner° of the insulation board� into the soil �elow. Th� <br />iasulation shall extend a minimum of four feet (4t) from ihe Qenterlin� <br />of the �at�rmain or �ervie�, a�d a minimum of six feet �6') beyond the <br />edge of th� storm sewer or structure alo�g the centerline of the <br />watermain ar service. The aCtual depth, tbieknsss, width and length to <br />be insulated shall be dstermined in the field hy the Engineer or his <br />representativ� or as noted in the plans. <br />304.000 METHODS ,0� TESTIN�, AM? DISINF�CTION <br />Ths Contractor shall perform all <br />Engineerss presence. <br />�04.10i� Leakar�e Test � Watermains <br />teating and disinf�Gting in the <br />A leakage test shall be performed on each valved s�etior of c�atermain <br />to determine th� �quantity of water ';h3t must be supplied iz�ta each <br />� section to maintain a test pressure of 150 pound� per sc�uare i.nch, <br />aftei^ the test section has been slowly filled with wat��r and a�.l the <br />air Y�.as been expelled from the line. The specified pressure sh,a11 be <br />� applie� and sufficient wate�r shall be measured and supplied int�� the <br />pipe aection to maintain �he pressure for a test duration oi' 'cwo hours <br />(2 hrs.). <br />LJ <br />�� <br />� <br />L = ND P <br />3,700 <br />L= Maximum permissible leakage in gallons per hour. <br />N� Number of joints in length of pipe tested. <br />D� Nominal diameter of pige in inehes. <br />P; Average test pres�ure during the test, in pounds per <br />square ineh, gauge press�ure. <br />� If the pipe �ection under te�t contains pipe of' various dia.meters, the <br />allowable leakage will be the 9u� of the computed lealcage for ea�;h si�e <br />of joint, <br />� <br />L�J <br />�J <br />� <br />� <br />Th� contractor shall furnish the pump, pipe eonneetiona, gauges, and <br />mea�uring equipment, and shall perform tihe testing under the direet <br />supervision of the engineer. Where psr�anent air vents are not <br />provided, the contraetor shall proaide and install cor�pora�ion cocks at <br />the high points as needed for release of air as the linz is being <br />filled with water. <br />