Laserfiche WebLink
� <br />� <br />� <br />� <br />304.2 Continued. <br />300-17 <br />NOTE: AFTER THE TEST, TiiE HXDRANT SHALIG Br, SHUT OFF AND A CAP LQQSENED <br />TO ALLOW HYDRAMT DRAINAGE. TIGHTEN CAP AFTER DRAINAGE. <br />A hook-on type D.C. ammeter plaeed on �one of the eahles leading ta the <br />hydrant is�a convenient method of ineasuring current. <br />In usin,g arc welding machines, the ourrent cantrol 9hould be set at <br />minimum befor� atarting. After starting the machine, advanae the <br />control until the eurrent indicated on the amzneter is at the desired <br />test value. <br />CAUTION: In case of open circuits at joints or conneetions, the <br />� voltage aervss the defective joint or connection will be in <br />the �rder of' 80-100 volts. <br />� 30�4,3 <br />� <br />� <br />� <br />�1 <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />O <br />Disinfection <br />A11 water distribution system or ex�ension to existing system, or any <br />valved section oi such eacten3ion, �r replacement, shall be disinfecied <br />prior to placing same in service. Such chlorination shall con�ist of a <br />d�sage of chlorine equivalsnt to 50 parts per millian of ehlorine. <br />This may be accomplished by using a commerci�l type chlorinator for <br />feeding a chlorine solution or by plaeing dry Calciuffi H�� <br />as "HTH", "PERCHLORON", or "MAXOCHLOR ai the ra�e of on�ochlorine such <br />material containin n pound (1,�) of <br />� 70� aeailable chlorine per eaeh 16$0 gallons of <br />water in the line. <br />A predetermined dose shall be shaken into the suetion wall, the staxid- <br />P1P� ox' eleva�ed tank, or into ths pipe at the fir�t <br />the existing water pipe, an� the dosage shall be repeated�attfrequent� <br />predetermine� intervals, preferably at each pipe joint as the <br />laying progresses, or as may be dir�eted by the Engineer, plpe <br />Wh�n treated with dry calcium hypoehlori.te or with dry chlorin�ted <br />lime, the newly laid pipe shall be filled very slowly to avoid washing <br />the powder to �he extremity of the pipe line. <br />Tre��ed water shall be retained in the <br />non--��?ore-forming bacteria. This periodlshallnbeeatugeast three�hours <br />and �referably longer as �nay be directed, After chlArine treated water <br />ha� been �^etained for the required time, the chlorine residual at pipe <br />extremitiE:s and at other ��epresentative points shall be at least five <br />parts Per million. <br />In the pr�c�ss of chl.orinating newly laid Water pipe, all valves or <br />othex� appurtenances shall be operated wlhile th� pipe line is filled <br />with the chlorinating ag ent. <br />Followin� chlorination, all treated wa�er shall be thoroughly flushed <br />from the n�wly Iaid pipe at its extremities until the replacement water <br />throughout its len�tti, shall, upon test, both ehemically and <br />bacteriologically, be pro�t�en equal to the water quality served the <br />