Laserfiche WebLink
0 <br />� 5d3.3 <br />�1 <br />�� <br />� <br />� <br />� <br />, <br />�' <br />. <br />� <br />� <br />� <br />� <br />� <br />� <br />500-u <br />Continued. � <br />At that time of pipe plaaement, the bed�in8o °the��ine between bellh a� <br />to provide uniform and continuou� �uPpo p p oint <br />holes. Bell holes shall be excavated aa necessary to make the � No <br />connections, but they shall be naterrnor When theltrench orUbedd�.ng <br />pipe material shall be laid in W Unless otherxise <br />conditions are otherxise unsuitable or o�rOsee•shall be laid with the <br />permitted by the E:igineer, bell and 8p�shallpstart at the downgrade <br />bell ends facing upgrade and the laYinB <br />end and proceed upgrade. <br />laaement or handling precautioaa prove inadequatestalltsuitable <br />Whea p <br />Engineer's opinion, the ContractorthQaopenendseofneach pipe aeation <br />plugs or caps effeetively closing <br />before it is loWered into laying P <br />osition, and they shall remain 9unit. <br />covered until removal is necessarY �or conneation of an adjoining <br />ot i e is placed in laying position, <br />As each length of bell and spig P P e forced home <br />the spigot end shall be center�ed �ad�he Thelpipe shallibe secured in <br />and brought to aorrect line an 8 <br />place With approvsd backfill material, whioh shall be ��OrThehjoint <br />compacted around the pipe as described in Section 302•7• revent <br />recautionq shall be taken to p <br />areas shall remain exposed and P until the joint seal is <br />the soil from entering the joint space, <br />effected. <br />Whenever existing utility struetures or branch connectionsile3diQg to <br />main sewers or to main drains, or other conduits, ducts, p P � <br />rade and alignment of the pipe, <br />structures present obstruetions to th�e�oved, relocated or <br />they shall be permanently supported, <br />reconstructed by the Contractor involved. In thoseaiaeviationwfrom <br />their relocation or reconstruction is impraete�shall be made in the <br />line and grade wi�l be ordered, and the chang <br />manner directed by the Engineer and with extra compensation allowed <br />therefore. <br />When Natermain, water services and sewer services, whether�flS�orm °r <br />existing, are in danger of freezing due to the pr-oximity <br />sewers, catch basin leads, or storm etweenSthecstorm�sewerEandnthe may <br />direet the placement of insulatiecified in Section 3�3•9• <br />watermain or service pipe, as sp <br />All manholes and catch basins will be set plumb. All openings along <br />the line of Storm Sewer shall be secure�able�stoppersdshallebe placed <br />the suspensior. o'.' aork at any time, sui <br />to prevent eart�l or ar:y substance from egtshalg remainoin place.until <br />water is present in the trench� the seal <br />Where pipe cannot be placed by open <br />the trench is completely dry. and payment therefore shall be <br />trench excavation, the method of placing <br />stated in the "Special Conditions" <br />