Laserfiche WebLink
� <br />603.000 Continued. <br />600-3 <br />WIDTH OF TRENCH may vary with, and depend upon, the depth of trench and <br />the nature of the excavated material eneounte�ed; but in any case, <br />shall be of ample width to permit the pipe to be laid and jointed <br />properly and the backfill to be placed and compaet��d properly. The <br />minimum width of unsheeted treneh for pipe less }han 10 inehes shall be <br />18 inehes and for pipe 10 inchea or larger, at ieaet two foot greater <br />than the diameter of the pipe, except by consf.nt af the Engineer. <br />The maximum clear width of the trench at the top of the pipe shall <br />not be more than two feet greater than the ��utside diameter of the <br />pipe. <br />Unless otherwise specified on the plans, all pipe will be placed in a <br />flat bottom trench with tamped backfill. The sides of the treneh shall <br />slope back to provide a stable slope for the particular type of soil in <br />the trench. <br />If the trench is excavated to a greater width than authorized, the <br />Engineer may direet the Contractor to provide a higher elass of <br />bedding, a higher strength pipe or both, than that required by the <br />Contract, without additional compensation therefore, as the Engineer <br />may deem necessary to satisfy the design requirements. <br />FAULTY GRADE of the trench below grade lines shall be correc�ed with <br />� approved material, thoroughly compaeted without additional com en a <br />to the Contractor. P s tion <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />SOLID ROCK EXCAI�ATIONS shall include such rocks as are not decomposed, <br />Neathered or shattered and whieh Nill require blasting, barring, <br />wedging or use of air tools for removal. Under this classification <br />shall be included tt�e re�noval of any concrete or masonry structure <br />(except concrete pavement, aurb pavement, curb and <br />that cannot be removed by the standard trer�ching equipmentandThedewalk) <br />removal of individual boulders shall be defined as solid roek <br />excavations sheer the size of boulders shall be defined as solid roek <br />excavation where the size of boulders exceeds two cubic yards. <br />LOOSE ROCK EXCAVATION shall include all siratified roek, sandstone, <br />cemented gravel, shal� and boulders not otherwise defined as solfd <br />rock� regardless of how removed. <br />BLASTING for excavation will not proceed until the Contraetor has <br />notified the Engineer of the neeeasity to do so. This notification <br />shall in no matter relieve the Contractor of the hazards and liability <br />continge�t on blasting operations. The hours of blasting will be fi�:ed <br />by the Engineer, Any damage caused by blasting shall he repaired by <br />the Contractor at his expense. The Contractor�s ethod of ro edure <br />re a t i v e tQ b a s t' �----- —�—� <br />1 ir�g shal con orm � o a and State.laws and <br />municipal ordinances. <br />When excavation is encountered that is unsuitable for backfill, it <br />shall be rec�oved as directed by the Engineer, <br />