Laserfiche WebLink
. <br />�� S�' �1 <br />June 29, 1987 <br />� <br />TO: Jim Andre <br />FROM: Craig Waldron <br />SUBJECT: ROSEPOINTE DEVELOPM�NT <br />cc: � Gordy Beseth <br />Charlie Honchell <br />In response to the question regarding the building height and <br />parapet on the Rosepoint I��velopment, I have had an opportunity <br />to discuss the situatiQn with Gordy. The developers are staying <br />within the required heights according to their submitted plans. <br />In an instance where an elevator shaft or a mechnical system is <br />being covered through a building-type structure, it was required <br />as part of the Council Special Item Na. 6, on t�ie attache�. letter. <br />Attch. <br />x <br />0 <br />