Laserfiche WebLink
� <br />� <br />� <br />ESTIAIATES OF COST <br />Est�n�tes of cost are given by district in this section and detailed "block <br />hy block" costs are given in Appendix "�". <br />The costs as given include ad�quate a"i.lowanees for Engineering costs but an <br />additional lOX has been added for contingencies and other presently indeter- <br />minate costs. Cos[s for easem�ents for th� construction of sewers were esti- <br />mated on the �iasis of previous experience and are ineluded with ti�e cost <br />estimate�. Also incl.uded arp the costs for the resurfacing of village streets <br />and county maintained roads, together with �dsts for compaction and reasonable <br />replace�ent of ba.:.:kfill materials. <br />Prices for the estimates of cost given in this report are based upon costs to <br />be encountered at [his time with reasonable allowance for unforeseen condi- <br />tions and anticipated increases. The estia�ates should be reasonably accurate <br />for at least one year's time. <br />I- County Raad "B" & Cohansey Blvd. to T. H. ��36 <br />1290 ft. of 27" through 36" $33,$04.00 <br />ZI - Reconstruct 4•pen Ditch - to Wate=course <br />in Park - 800 ft. (ditch) <br />III - Private Property - Cohansey Blvd. to Bossard <br />Drive 350 ft. of 15" <br />$ 2,400.00 <br />.$ 4,746e0� <br />IV - County Road '�B" and proposed north-sou�h stre�t <br />1030 ft. o£ 12" through 27" $16,398.00 <br />V- New east-west street east of Dale Street <br />450 ft. of 12" <br />_ 4 _ <br />$ 4,866.00 <br />TOTAL $62,214.00 <br />