Laserfiche WebLink
��� � � � � � � � � � � � � � � � � � � <br />ITEli <br />� <br />C��ss "A" Excavati�n <br />Clearing <br />Grubbiag <br />Remo`re P�vement <br />Remove Curb <br />Sodding <br />ESTIi�ATE Ol� COST <br />FRONTAGE ROAD GRADING , BASE AND SURFACING <br />HAZSI,INE AVENUE TO APPROXIMATELY 150Q FEET WEST <br />UNIT <br />�TN IT P RICE UANT ITY <br />Adj�st Frame aad Ring Castings <br />Ad j r�s t Ga te Va lve Box <br />Sarnd Gravel Sub-Base in place <br />� Gr�tvel Base i.n place <br />�, Bituminous Materi�al for Prime Coat <br />� Bituaainous Materi.al for Mixture (�C-1) <br />� 8ituminous Mixture <br />Concrete �Driveway i'avement 6" th'_c!�. <br />C�urb �nd Gutter <br />* Does not include cos t of land <br />�- � <br />,: : <br />-4,. <br />�`�" .. . ... - . - - _____ <br />cu.yd. $ 0.41 r,50U <br />tree 10.00 150 <br />tre�e L0.00 150 <br />sq.yd. 1.00 200 <br />lin.ft. 0.40 300 <br />sq.yd. 0.55 4,500 <br />Assembly 20.00 10 <br />Assembly 10.00 5 <br />ton 1.35 1,200 <br />ton 2.65 625 <br />gal. 0.17 850 <br />ton 34.00 18 <br />ton 4.00 310 <br />sq.yd. 4.00 30 <br />lin.ft. 2.75 3,080 <br />SUB-TOTAL <br />Plus Legal, Engineering and Con,tingencies <br />TC1�AL COST * <br />Pa ge 10 <br />AMOUNTT <br />$ 1, 025 . 00 <br />1.500.00 <br />1,500.00 <br />200.00 <br />120.00 <br />2,415.00 <br />200.00 <br />50.OQ <br />1,620.00 <br />1,656.25 <br />144.50 <br />612.00 <br />1,240.00 <br />120.00 <br />6.470.00 <br />$ 20,932.i5 <br />5,067.25 <br />$ 26,Q00.00 <br />� <br />