Laserfiche WebLink
� <br />�� <br />3. Gradin� on County Road "B-2" should be initiated at such time as site g�adiag <br />is subatantially cc�mplete within the t#llied Stores area. <br />� 4. Schedu',ing of C�unty Road "B-2" and Frontage Road construction east of Trunk <br />iiighwa�r No. 51 requires campletion of County Road "B-2" roadways before Frontage <br />Road work is started "to fa�ilitate local traffic in this area. <br />5. Construction of the sKorm sewer from �ruce Street to County Road "C" al�r►g the <br />approximate alignment of existing County Ditch No. 4 and the repair of County <br />Ditch No. 4 betwe�en County Road '"C" and Lydia Avenue be accamplished prfor <br />to t�te rough site grading of the Allied Store� property. <br />6. Storm sewer and utility construction within the County Road "B-2" improvement <br />be const�ucted following the grading of this roadway. <br />7. All pro�osed constructi�� work requires close coop�ration between the represent- <br />atives of the Village, �'iinnesota Highway Department and Allied Stores to insure <br />that the required facilities cmn be expeditiously planned and constructed at <br />least Fossible delay and cost to a11 concern�d. <br />- 2 a - <br />