My WebLink
|
Help
|
About
|
Sign Out
Home
pf_00375
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF001 - PF999
>
300-399
>
pf_00375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 10:58:21 AM
Creation date
2/9/2016 12:38:16 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
375
Planning Files - Type
Variance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ' � � <br />June 7, 1967 <br />� <br />� <br />C �1 <br />CASE: <br />APPLICANT: <br />LOCATION <br />375 -67 <br />� � <br />Otb Esch Equipment Supply Company <br />Northeast corner of St. Croix Street and Highway 36 <br />ACTION REQUESTED: Variance to required setbacks and permission to operate <br />construction equipment rental. <br />PLANNING CONSIDERATIONS: <br />1. The Engineer and y�ur Planning Con�ultant have met with the applicant's architect <br />sever4l times to re��iew and adjust the proposal in question. Revised site plans have <br />been prep�ared indicating the G�ture right-of�ways required by the Highway Depart- <br />ment with respect to the Highway 36 Frontage rood and the realignment of $t. �raix <br />5 tree t . <br />2. On the ��uth side, th�e bui Iding proposed has a 40 Foot setLu,,,, trom the existing <br />right-af�way but wi I I be 30 f�et back from the F��ture r�ght-of -way I ine. (n view <br />of the extrema widths of Highwoy '6 in this or�a and the nature of the ground <br />around the building, we feel that this would not be a serious problem. <br />3. The office oroposed to be on the westerly side af the buiiding (facing Delux Check <br />Company) will be approximately 40 feet from the Future rig'�t-of-way of $t. Croix <br />Street. The variances required here, f. �ever, in that the existing right-of-way <br />is 20 feet From the corner of the proposed bu i Id ing . Thus, i t wou Id appear that this <br />would not be a serious probl.em either. <br />4. Th� building and plot plan have been redesigned to a twc-story office building and <br />a 200 x 90 foot warehouse a!I of which will be constructed of pre-cast masonry slabs <br />(similar to the Control Data Building). The applicant now proposes to have no renti;al <br />equipment outside of the building and can accommodate 50 parking spaces, which <br />conForm to the requirements �f the zoning ordinance for the office space and the <br />warehouse space involved. <br />5. We have reviewed details witli respe:,t to the drainage easement that apr,!;es to this <br />property and the Engineer has indicated his approval of the proposed construction <br />handled in the fashion as shown on the drawings submitted. This can be further <br />reviewed at the Public Hearing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.