Laserfiche WebLink
' <br />�� <br />' <br />�l <br />I; <br />� <br />2. Proper storm drainage systems should be provided in existing developed <br />areas prior to installation of permarent paved streets. <br />3. A comprehEnsive storm water syst�m is necessary before much of the a�ea <br />north of County Raad I can be devefoped; the storm szwer system sh�uid <br />be designed in such a manner that the present water tc�ble level will be <br />(owered to permit building construcfion. <br />' 4. Storm drainage systems shovld be planned in caop�ratian with nearby <br />communities due to the inter-community natur� of the problem. <br />� <br />'LJ <br />� <br />� <br />,� <br />� <br />� <br />� <br />� <br />5. By 19�35, a I 1 areqs i n the Vi ( lage shou Id be provided vvi th sani Pary sewer <br />service. Prior to tFie instaliatian o� sanitary sewers, ail'buildings should be <br />placed on (ots af adequate size xor individual dispasal systems until such <br />time thcat public sewer service is available. No building shouid be pe�- <br />mifited thah will be a potentiai source of pol�ufiion prior ta cnnnection with <br />public sewer. <br />6. A cvmprehensive pfan for extensian of water IIR@5 inta ai) parts af �he <br />Village should be prepared as soon as possible. This plan is especeally <br />+mpo�tant if the Village hopes ta attract business qnd inr�ustrr due to t�te <br />need for aciequate fire pratection an�J lo�ver fire insvrance ratesa <br />7. To the �xtent feasible and practicable, al) utiliiies should kze installed <br />prior to development of perman$nt streets. UtiPiti�s should be insta(led <br />prior tr� subst�ntial building development ir� the fu�ure to avaid possib�e <br />years of project planning, disrvption of street service, citizen inCor�ven- <br />�ence, tirrn� consumir,g assessment hearings, and a pate�work of ass�ss- <br />menh o�� individual properties, <br />6. Where feasiole and practica�le, electricai and teiephone lines sho�+lci be <br />plc�ced underground. AI( utility easements not part of an appraveci s�rb- <br />division should require a special use permit. Where power lines cannot <br />b� placed underground, the rig��t-of-way si�ould be plannPd Fo properPy <br />bisnd into the environment ra�her than being in shorp crntrasi� to surrountiing <br />rea tures . <br />9. ihe water I�vels oi the various lakes and ponding areas should be cont�olled <br />� in accordance �yith a comprehensive plan for storm water drainage, I�90 <br />buildin�s should be �,erm�tted in areas subject to flooding, <br />� <br />c� <br />