My WebLink
|
Help
|
About
|
Sign Out
Home
pf_00500
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF001 - PF999
>
500-599
>
pf_00500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 1:39:52 PM
Creation date
2/9/2016 12:47:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f� � <br />� conform with the requirsments of AoS,T�rfe "Specifications for Concr <br />Masonry Units for C�nstruction of Catch Basins and Manholes", SerialtDesig- <br />natinn C-139-39. The blocks sha11 be radial bloeks, Wa11 thickness and man- <br />� hole diameters shall be .�s stated in the "Special Provisions", or as shown on' <br />the plans� <br />� <br />� <br />;� <br />� <br />� <br />' <br />� <br />L: _ I <br />24002o14C Manhole Brick: Brick specified for manholes sha11 conform to the requirements <br />of the Standard Specifica_tions for c.7.ay sewer brick, AeS�T�M, Aesignation C-32- <br />37T� Unless �therwise specified the grade required sha11 be NA. <br />24002,15 Concrete Materials: Concrete for monolithic �oncrete manholes and all manhole <br />bases shall consist of St3ndard Portland Ceme�it Type I, clean washed sand and�_ <br />crushed rock and gravel free from deleterious materialse Portland cemenk shall <br />conf orm to A.SoT,M< Specifications, Portland Cement Type I, Standard Serial <br />Designation C-150-47n Gradation shall be subject to the approval of the Engineer <br />24002.16 Mortar Materials: Mortar used for laying up concrete block or bri�k manholes or <br />used for plastering up interior of manholes shall consist of Standard Portland <br />Cement Type I, hydrated lime and clean, sharp, well graded sand, free from <br />deleterious materials, Portland cement shall conform to AoS,T,M. Specifications, <br />Portland Cement Type I, Standard Serial Designation C-150-47s Lime shall conform '�� <br />to specifications far normal finishing hydrat�d lime, A,SaT.Mo Seri.31 Designatiop, <br />C-6-44 or specifications for hydraulic hydrat�d iim� for structural purposes, _�', <br />A.S.ToM. Serial Designation C-141-42, Natural cement shall conform to the ;`�. <br />requirements for natural cement A,SoT�M� Serial Desigr�ation C-10-37� Gradation a�� <br />shall be subject to the approval of the Engineere - <br />24050, CONSTRUCTION REQUIREMENTS; t� <br />24051, INSPECTION: t,`'` <br />24051.1 Of Materials at Fac*ary: Al1 materials whether furnished by the Owner or by F <br />the Contracto� axe subject, at the discre*.ion of the Owner, to inspection and <br />approval at the plant of the manufacturer� <br />24051.2 Of Materials at Delivery Point: During the process of unloading, all pipe and <br />accessories shall be inspected by the Contractor fr� loss or damage in transite <br />No shipment of material shall be accepted by the Contractor until or unless <br />notai-ion of any lost or damaged material shall have been made on the bill of <br />lading by the agent of the carrier. <br />24051e3 Fie�d Inspection: All pipe and accessories shall be laid, jointed, tested for <br />defects and for infiltration in the manner herein specified as directed by the <br />Engineer and subject to his approval, � <br />24051e4 Disposition of Defecti.ve Material: Al1 material found during the progress of the <br />�aork to havP cracks, f.laws, or other defects wiil be rejected by the Engineer, <br />and the Contractor sha.11 prompt�y remove from the site of the work such defective <br />material, <br />' 24052e CONTRA.CTOR'S RESPOI�SIBILITY FOR MATERIAL: <br />24052_1 Responsibility for Marerial Fu.rnished by Contractor: The Contractor shall be <br />responsible for all material furnis'�ed by him and he shall replace at his own <br />� e�cpense all such mat�rial rhat is fo�nd to be defective in manufacture or that <br />has become damaged in handling after delivery by tt-.e manufa.cturer, <br />' 24052�.2 Responsibi_lity f�r MateYial Furnished by Oc,mer: The Contractor's responsibility <br />for material fu�-ciished by the Owner sha.11 begin at the point of delivery by the <br />24000 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.