Laserfiche WebLink
W-1.2 Electrical Conductivi� <br />Each joint on cast iron pipe, val�es, hydrants or fittings, either "push-on" <br />or mechanical joint type sha11 be electrically bonded with an external copper <br />jumper capable of carrying 500 ampso af current for� an extended period of <br />time to provide integral el�ctric thawing capabilities, <br />These copper jumpers can be either shop or field applied in accordance with <br />these specifications. For field applied copper jumpers, either the "Burndy- <br />Thermoweld" as supplied by Burndy Corporation, Norwalk, Connecticut, or <br />"Cadweld" by Erico Products Company, Cleveland, Ohi� will be permitted. <br />Contractors or suppliers shall submit the method they propose to use for <br />approval prior to construction. <br />The copper jumper shall be a minimum 1/16" x 1/2" wide flat strip or equal <br />� cross section round copper wire in the annealed condition conforming to <br />ASTM Specification B152-58 Type DHP. <br />' All copper jumpers shall be welded to the pipe and fittings by the metallic- <br />arc welding process, if shop applied or by the exothermic welding process <br />if field applied. <br />I <br />� <br />�I� <br />The copper jumper can be applied as a single sCrip welded at each end across <br />the joint or by multiple strips with bolted connections in the middle. <br />Silicon bronze bolts and ntits sha11 be used on all bolted connections. <br />All welded connections shall be made on a clean metal surface which has <br />been graund to remove coating and oxide. The area at the connection, <br />including the wel.d, shall Ue refinished with its original coating or other <br />suitable protective coatings specitied. <br />The assembled copper jumper across the joints shall be so installed thaC <br />� expansion, contraction, or relative pipe movement incidenta] to normal serviee <br />use will not damage the connestion to such an ext�nt that electrical resist- <br />ance will vary ac.�ss the joint. <br />� <br />� W-2 <br />� <br />The completed water main system shall be tesCed f�r electrical conductivity <br />according to that st�ted elsewhere in these specific�tions. <br />CONSTRUCTION REQUIRETiENTS <br />W-2.1 Depth of Cut: The water main sha11 be pl�ced with minimum 8 feet of cover. <br />Howev�er, �reater depth may Ue required at cerCain 1oc�Cians to clear existing <br />sanitary sewer and sanirary sewer services. Accc�rdingly, the pipe will be <br />laid to the depth s�bst�ntially as sho�.m on thc� plans. These adjustments <br />may be required in the field, ��nd no unit of ineasurement or paym�nt shall <br />apply for such vari��tiun. <br />W-2 .2 Excava tion � A11 w•�rk sha 1 1 l�e d,�ne by open cut . <br />' W - 3 <br />