My WebLink
|
Help
|
About
|
Sign Out
Home
pf_00500
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF001 - PF999
>
500-599
>
pf_00500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 1:39:52 PM
Creation date
2/9/2016 12:47:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />r <br />� <br />� <br />� <br />� <br />, <br />� <br />� <br />� <br />� <br />disputes between the OWNER and the CONTRACT�R shall be presented to the <br />ENGINEER for decis�on-. <br />14,2 Claims, disputes and other mat.ters relat�ng to the execution and <br />progress of the Work or the ;nterpretation of the Contract Documents <br />sha�l be ref erred initially to the ENGINEER for decision, which he shall <br />render in writtng within a reasonable time, Either party may demand <br />arbitration with respect to any such claim, dispute or other matter that <br />has been referred to the ENGINEER. <br />If the other party consents to arb?tration, within 5 days after demand, <br />arbitration shall then be conducted in accordance with Article 41, If <br />neither party demands ar�bitration, or if one party does noi, consent to <br />arbitration, t;ien the parties sha11 be lef�t to their legal remedies. <br />However, no demand for~ arbitration of any such claim, dispute or other <br />matter shall be made until the ear�ier of (a) the date on which the <br />ENGINEER has rendered his decision or (b) tl�e tenth day af ter the parties <br />have presented their evidence to the ENGINEER if he has not rendered <br />nis written dec�sion before that date. No demand for arbitration shall <br />be made later than th�rty days after the date on which the ENGINEER rendered <br />and furnished his written decision in respect of the claim, dispute or <br />other matter as to which arbitration is sought; and the failure to demand <br />arbitration within said thirty days' per�od shall result �n a �vaiver of <br />arbitration rights under Article 41, If the ENGINEER rende s a decision <br />after arbitration proceedings ha��e be�n initiated, such deci:ion may be <br />entered as evidence but shall not supersede the arbitration pr,�ceedings. <br />except where the decision is acceptable to the parties concerned� <br />ARTICLE 15 - SHOP DRAWINGS AND SAMPLES <br />15.1 After checking and verifying all field measurements, the CONTRACTOR <br />shall submit to the ENGINEER, for approval in accordance with the accepted <br />� schedule of Shop Drawings submis�ions, �ive copies (or, at the ENGINEER'S <br />op�ion, �ne reproducible copy) of a�l Shop Drawings, which shall have been <br />checked and approved by the CONTRACTOR, The data shown on the Shop Drawings <br />' shall be complete with respect to d�mensions, design criteria, materiais <br />of construction and oth�r details to enable the ENGINEER to review the <br />information as requi� �d. <br />�� <br />� <br />� <br />� <br />� <br />L�J <br />15.2 The CONTRACTOR shall also submit to the ENGINEER for approval, with <br />such promptness as to cause no delay in the l�lork, all samples required <br />by the Contract Documer�tso All samples sha�l be checked and approved by <br />the CON7RACTOR, identified c�early �s �o mater�al, manufacturer, any <br />pertinent catalog numbers and the use far wh�ch intended prior to submitiing <br />them to the ENGINEER. <br />15.3 At the time of each submission, the CONTRACTQR will, �n writing, call <br />the ENGINEER'S attent�on to any deviations that the Shop Drawing or sample <br />may have from the re�uirements of Contract Documents. <br />15.4 The ENG[NEER will check and approve, with reasonable promptness, <br />Shop Drawings and samples, but his ch�ckinq and approval shall be limited <br />to review for conformance with the design concept of the Project an� for co�i- <br />pliance with the �nformation given �n the Contr�ct Documents The CONTRACTOR <br />G-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.