Laserfiche WebLink
;� <br />� <br />�J <br />, <br />� <br />� <br />� <br />� <br />L: <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />;� <br />� <br />��hall make any� co�r�ections required by the. ENGINEER and return the <br />�equired number� of� corf�ected cop�es �r �hop Drawin�s or- r�esubmit <br />new samples� The appra°�al o� a separate }tem, as such, wi11 not <br />indicate approval of the assemb��� in wh�ch the item tunctions. <br />15e5 Nn �Jork requiring a Shop Drawing or sample submission shall <br />be undertaken urt�l the submiss�on has been appr-oved by the ENGINEER. <br />15.6 The ENGINEER'S approval of Shop Draw�nqs or samples shall nat <br />relieve the CONTRACTOR from hi� responsibllity for any deviations <br />from the requirements of the Contract Documents unless the CONTRACTOR <br />has, in writing, called the ENGINEER'S att.ention to such deviations <br />at the time ot submis�ion and the ENGINEE�. has given written approval <br />to the specific devia��on, nor shal� it relieve the CONTRACTOR from <br />error�s or omissions �n the Shop pr�wings. <br />ARTICLE 16 - TESTS <br />16.1 Tf the Contract Documents, the ENGINEER'S �nstructrons, laws, <br />ordinances or any publ �c author�i ty requ�res any l�lork to I�e tested <br />specifically or a pproved by another author�ty, the CONTRACTOR shall <br />give the ENGINEER t�mely notice ot readiness therefor. the CQNTRAC- <br />TOR shall furn�sh the Efi�GINEER the rec�utred cert�ficates of testing <br />or approval All such tests �vill be �n accordance with the methods <br />prescribed by th� American Society for Test�ng and Materials. I�' <br />any such 1Jork required to be iested �s cancealed or covered without <br />���ritten approval or cons�ent of the ENGdNEER, �t must, if directed <br />by the ENGIPlEER, be uncovered for exar�7�nation, at the CONTRACTOR'S <br />expense The cost of all �uch test� shali be borne by the CONTRAC- <br />TORa prodided ihat, if any such test �� request�d only by t�e <br />ENGIidEER'S �nstr�uit�ons (and not requirP.d by the Contra t Oocuments <br />or otherwise) and �r Ghe test reveals that the t�1o� k�nvoived meets <br />the requir��ents of the Contract Documents, the CONTRACTOR will be <br />allowed an incre�se �n �,he Contraet P►-�ce or an e,ctens�nn of the Con- <br />tra�t Time directly attributable to making the test �f he maKes <br />claim therefor as �rov�ded �n Articles 21 or 23. <br />16.2 Any i�lork wh�ch fails to meet the requ�remEnts of any required <br />test or approval and any t�lo►•k ���li�ch n�eets the �-Pqu�,��:rAnts of any <br />required LesC or appr-oral I�ut wh�ch doe5 not: meet th� requ��r�ments <br />of the Contract Do�uments sha 11 t�e cons �dereci defecti ve or may be <br />rejected Re,�ected �•�ork shall h� removed prompt�y �rom the s�te <br />by the CO�JTRAGTOR �anless Lt�e def�c,�enc�e� are corr�cted promptly by <br />hir�. !f, �nstead of i-equirina C�rrect�on ar rei�»val ofi any suti� <br />d�fectiv� �1�� {�, ti�e 0�•;�+cR ancl C?�� �iJuii`EER pret�r to ��ccept �t, <br />tr,ey may do soy �n ���i�ic!7 case a Ch�nge Or•der sh�ll be ��ssued �ncor- <br />porat�r�� the nec�ssar�y revisions �n the Contr��ct DoGum�nts �nciud- <br />�n� an appropriate reduction in the Cantratt Price <br />�1RT ICLE l�_� r,pr;TRACTOR' S Sl1PERU I> i0N /1i�Q SU�ER I NTEN�Ef�CE <br />17 1 The CONTRI�CTUR shall ;upervi,e tind d;rect th� l•Jork etric�ently <br />usinq h�s best sk�ll an�i aCtenL�on. He ,v�ll �e solely respon�ible <br />for tl�e ��r�1t11C�U�S anct sequ�nces or i.��i�;LruCttOn C�tore i�ndertahing <br />�; - 10 <br />