Laserfiche WebLink
• <br />rJ <br />DATE: <br />TO: <br />FROM: <br />MEi�iORI�N DUM <br />September 13, 1990 <br />Steve Sarkozy <br />John Shardlow <br />SUBJECT: PLANNING OFFICE HOURS, September 12, 1990 <br />1• Daniel and Fred Commers (633-6312) <br />Daniel and Fred Commers from Roseville Properties and Ken <br />Chestnut of Construction 70 met at the Roseville Post Office site <br />on County Road B2 to inspect the landscape improvements that were <br />made pursuant to staff direction. We inspected the repairs that <br />were made to the back side of the site where erosion had <br />previously occurred, the reseeding and the erosion control <br />measures that had been put into place on that part of the site. <br />We also inspected and determined that splash blocks had been ut <br />on all of the roof drains and that the rear side of the p <br />had been seeded. Much of the discussion �ocused on the condition <br />of the bank at the south side of the property where erosion had <br />recently occurred. Although the solution was far from optimum <br />Roseville Properties had paid a landscape contractor to overseed <br />with crown vetch which we had directed. It is our opinion that <br />assuming that this crown vetch takes (which it almost undoubtedl <br />will) that this material is so invasive that it will take over <br />the area. When it has taken over the area, it will provide the <br />optimum protection from erosion and provide a suitable low <br />maintenance ground cover for this area. <br />2• Nelson (484-9027) <br />Robert Nelson is the architect representing the Wonderful Muffler <br />Man shop on Rice Street, immediately south of Owasso Blvd. S, <br />This item had been continued at the Planning Commission meetin <br />and the applicants had been directed to meet with staff to <br />discuss ways in which appearance of the proposed metal buildin <br />could be upgraded. From our discussions with the applicant and <br />his architect, it is very clear that the budget is <br />on this project. It is also true that they are doinglaebuildind <br />that needs to have very high ceilings in some areas to <br />accommodate the internal wench. <br />suggestions of ways in which the image ofa the tbuilding could °f <br />improved with the addition of some color accents and some three <br />dimensional design elements. We also directed them to add some <br />landscaping around the perimeter of the site. We invited them t� <br />return in a week to discuss their progress on the desi n <br />modifications. g <br />� 3• Ranconi <br />Mark Ranconi <br />from Roseville Properties came in with a sign <br />