Laserfiche WebLink
• <br />. <br />� <br />� <br />ROSEVILLE PLANNING OFFICE HOURB 9/18/91 <br />ambulance servic ca� lf it ould be done thered <br />the facility for <br />broken bones, etc.), or to an area hospi.tal if <br />care were needed. <br />n <br />bring patients to <br />(stitches, setting <br />more sophisticated <br />The taller hotel structure would house the surgeons' and <br />specialists' offices, the lower 2-story structure would contain 36 <br />exam rooms for the clinic and other support services. The <br />ambulance garage would be in a newuld be almo t 22e000 square feet <br />of the building. Overall, ther� wo <br />of space in the pro�ect. <br />The site is in the heart of the Twin Lakes redevelopment are�ile <br />City expectations are high for its ultimate redevelopment. <br />we could support the proposed u�he asaecific redevelopm nt plans <br />valuable addition to the City, <br />Mr. Simmons had� prepared were not acceptable. The building would <br />be left mostly as is, with new wlndows and a new roof, but withT�e <br />major exterior renovation iineterms of numberlof spacesk�minimum <br />parking plan was inadequate, <br />dimensions, and circulation. <br />There was 1 ittle landscaping T�hoW aVe���t for the parking lotgsalso <br />placed in the rightwof-way. � We informed him <br />extended ir�to the right-of-�way, as it does now. <br />that addition�l right-of-way w�auld need to be dedicated 5s �orauon <br />of this project: 10' more on �airview Avanue and 2. <br />Gounty Road C. The new parking and landscaping would need to <br />conform �o th� setbacks and oth�r design sta�ndards, unless a clear <br />hardship could be �hown. <br />