Laserfiche WebLink
5. <br />� <br />Plannin � <br />g Office Hours <br />December 17, 1986 <br />Page 3 <br />Tom will be pursuin <br />of the school sitesg p°Ssible development potential in each <br />City regardin r and will keep in close touch with the <br />9 an� progress toward either. <br />4. Hallguist, 869-5�d� <br />Harlan �`" <br />Hallquist was with with Peter Luzaich <br />Master's Realty, Pete has � owner of ERA <br />and Beer Hall at the southwestccornertof Countpizza Parlor <br />Rice Street, and was y Road B and <br />Hallquist (a desi n build comhan design prepared b <br />site g� p yi to review a y Mr. <br />plan for the construction of a new buildinpreliminary <br />site. They w�uld like to g on this <br />building and I su achieve a 3,000 s uare foot <br />adjusted, ggested ways in which the q <br />perhaps with a variance to the setback Could be <br />Street, so as to acco on Rice <br />mmodate the fifteen cars required for a <br />3,000 square foot building. It a <br />ing the setbacks that this can bepaccomdlbY Carefully adjust- <br />P shed. <br />I suggested they contact the contiguous owners t <br />and the south, and that the building to the south� the east <br />buildingj be considered (a medical <br />provide access between theCtwolsitestwithouteWoys so as to <br />Rice Street. g ing out into <br />I feel that it is important to encourage the redev <br />this site although it is a ver elopment of <br />of the existing structure will beman1asset�toTthetearing down <br />building has no historical significance area. The <br />continued problem in the neighborhood for manbut has been a <br />Y years. <br />Casev 484-225g <br />Jlm Casey was in with <br />plan for his properties <br />east/west alignment of <br />City. <br />Dave Janisch <br />maps of the <br />Casey or his <br />sheet. <br />informed u <br />area, and <br />engineers <br />a sketch of his proposed development <br />off Victaria Avenue contiguous to the <br />Victoria in the southern part of the <br />s that the City now has the topography <br />that these would be avail�ble to Mr. <br />at a cost of $90.00 per half section <br />Mr. Casey produced a survey done b Caswell. <br />that Mr. Caswell or some y I suggested <br />pare a preliminar qualified surveyor should now pre- <br />showed Mr. Caseyyanlexamplelof na the City's to o ra h <br />emphasizing the importance of theptolominary and finaly� I <br />the a P gra h Plat, <br />ppropriate lot lines, drainage solutionln determining <br />sites. , and building <br />It appears now with the new topography tool thG� <br />• can finally come up with a good plan for the developmentasey <br />his property. Because of the strange conditions, it �f <br />as though a four lot, single family P.U.�, with a appears <br />access would be the most appropriate solution, private <br />