Laserfiche WebLink
r <br />; �� • � � <br />Fy' Planning Office Hours Page 2 <br />December 17, 1986 <br />We discussed signage, agreeing that the new sign would be in <br />line with the existing signs in the area and that there would <br />be no "twirling bucket" on the roof of the building or the <br />pylon. <br />3. Dunwell, 483-6701 <br />Tom Dunwell and Randy Engels then discussed possible use of <br />the Fairview School, which T noted was appraised at $3.2 <br />million (high in my opinion). We ta�ked about the critera <br />and possible uses. Tom noted tha� Senior Citizen's use might <br />be difficult, particularly with the two new projects underway <br />at Villa Park and Rosepointe. I suggested the possibility of <br />a YMCA or YWCA utilizing the pool and gymnasium. There is a <br />YMCA at 694 and Lexington and a U.S. Swim and Fitness Club in <br />the old Cub Food building across Rice Street in Maplewood. <br />Tom notes that architectually renovating an old school where <br />there are slabs on grade (as in this case) is difficult to <br />handle utilities for reworking the first level particularly. <br />We talked about the concept of reuse of the building <br />retaining fifty percent of the land f or open space. <br />I noted that the outdoor recreational facilities at Fairview <br />and Lexington Schools are a plannecl and integral part of the <br />recreational system in Roseville. We agreed that the keeping <br />� of the gymnasium and the pool for community recreation use <br />woulc� be a prime objective as well. <br />We also discussed the Lexington School. Tom noted, in <br />response to our question, that the Library Board has voted to <br />conduct a feasibility sttady on the Roseville site with the <br />possibility of an addition to accommodate their headquarters. <br />Secondly they agreed to study the prospects of making a <br />larger community library at a site in Shoreview with a head- <br />quarters attached to it. The overall program includes <br />libraries at Mounds view, Shoreview, an expansion in White <br />Bear, and a new library in Maplewood. <br />W� review�d the possibility of expanding the site in <br />Roseville by the acquisition of the two houses to the north, <br />the duplex immediate].y to the east (on County Road B), and <br />development of the rear portion of the residential lots <br />fronting on Dellwood� Thus, there would be no infringement <br />on the residential neighborhood to the east. <br />The Library Board has not expressed an interest in the Lexing- <br />ton School site, although the U.S. Postal Service has. Tom <br />noted that the local architect for the Postal Service is <br />Roger Fixsen (phone: 851-1151). The Postal Service for this <br />part of the country (limited to facilities) is officed in an <br />office building south of the stadium in Bloomington. Tom <br />. noted that the Postal Services normally put thEir trucking <br />operations inside. It is these trucking operat�ons which <br />normally are a principal deterrent to the use of postal sites <br />in residential neighborhoods. <br />