Laserfiche WebLink
� <br />� <br />U <br />� <br />� <br />The developer amended the plan to be consistent with the <br />approved plan. <br />2. Rosedale Marketplace Project. <br />Discussions and corrections have occurred concerning <br />building configuration, screen walls, signage, landscaping <br />and landscape bond requirements. Also, a Certificate of <br />Occupancy was not issued for the Chili's Restaurant until <br />proper :�arricades were in place to insure the site was safe <br />for customers. <br />Staff has also been involved on an on-going basis with th� <br />following two projects which were completed previously: <br />1. Har Mar project to in5ure t�at the landscape buffer which <br />was required along the south and east sides of the property <br />is being properly replaced and maintained. <br />2. The City was also involved with the Rosedale Commons project <br />concerning landscaping, signage, and proper trash enclosures <br />and screening. <br />In summary, staff is working to insure�th�ovals�ectWQa do this rby <br />constructed in accordance with City pp <br />withholding permits or Certificate of Occupancy until all items <br />are prop�rly complet�d. The Planning and Zoning Admin�.st�ator <br />inspects each project to insure tha►tZonin cAdminis�rator must <br />approvals are met. The Planninq and g <br />sign of� on all projects b�for�cts to �insure �hat tri X� ntinue <br />issued. We also work with proje <br />to b� maintained in accorciance with original approvals. <br />