My WebLink
|
Help
|
About
|
Sign Out
Home
2016-02-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-02-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 1:51:13 PM
Creation date
2/18/2016 1:33:47 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/23/2016
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upon request, the City Recycling Coordinator will undertake efforts <br />to educate the resident or owner regarding proper materials <br />preparation. <br />Multiple Family Dwellings <br />Contaminated carts of material will not be collected and a tag will be <br />left indicating the reason the material is unacceptable. The Contractor <br />shall also notify the City Recycling Coordinator by phone that the <br />material was left and the reason that the material was unacceptable. <br />It will be the responsibility of the Contractor to obtain cooperation <br />from the building owner/manager in removal of trash and separation <br />of acceptable materials so that the carts can be serviced. <br />5.08 Collection Zones <br />By Ordinance the City of Roseville is divided into five zones, each <br />with its own day of the week for collection of refuse and recycling as <br />detailed in Exhibit A. The number of housing units in each collection <br />zone is detailed in Exhibit B. <br />5.09. Collection Hours <br />Contractor shall maintain sufficient equipment and personnel to <br />assure that all collection operations commence no earlier than 7 a.m. <br />and are completed by 6:00 p.m. on the scheduled collection day. <br />5.10. Cleanup Responsibilities <br />Contractor shall adequately clean up any materials spilled or blown <br />during the course of collection and/or hauling operations. Any <br />unacceptable materials left behind should be secured within <br />resident's recycling container. Driver shall take all precautions <br />possible to prevent littering of unacceptable recyclables. Contractor <br />shall have no responsibility to remove any items that are not <br />recyclable materials and have been properly dealt with as specified in <br />5.07. <br />5.11. Missed Collection Policv & Procedures <br />Contractor shall have a duty to pick up missed collections. <br />Contractor agrees to pick up all missed collections on the same day <br />that the Contractor receives notice of a missed collection, provided <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.