Laserfiche WebLink
• Earth Day Celebration, 3`d Saturday in April <br />• Run for the Roses, 4h Saturday in June <br />• Wild Rice Festival, 2°d Saturday in September <br />Previously Roseville staff and volunteers monitored the collection <br />stations during the events and gathered the organic material, and the <br />Contractor delivered the organic material to a composting facility. <br />As part of their Value Added Plan, Proposers are encouraged to <br />describe their experience conducting Zero Waste events. <br />Proposers are also encouraged to address in their Value Added Plan <br />their potential for curbside collection of organics. As part of its Solid <br />Waste Master Plan, Ramsey County is requiring cities offer residents <br />the opportunity to recycle organic materials by the end of 2016. <br />5.06. Citv Retains Right to Specify Resident Preparation Instructions <br />The Contractor shall agree that it is the City's sole right to clearly <br />specify the resident sorting and setout requirements. Such <br />information shall be included in the annual public education flyer as <br />detailed in 4.05. <br />5.07. Procedure for Unacceptable Recvclables <br />If Contractor determines that a resident has set out unacceptable <br />recyclables, the driver shall use the following procedures: <br />Curbside <br />Contractor shall leave the unacceptable recyclables and leave an <br />"education tag" indicating acceptable materials and the proper <br />method of preparation (Note: a copy of the tag is to be included <br />with the proposal). <br />If the unacceptable recyclables have been tipped into the collection <br />truck, the driver shall record the address of the stop. The Contractor <br />shall send a letter to the resident noting the unacceptable recyclables <br />and providing information on what are accepted recyclables. <br />The address shall be recorded on a form acceptable to the City. <br />Contractor shall report the addresses to the City Recycling <br />Coordinator at the end of each month (Note: a copy of the form is to <br />be included with the proposal). <br />19 <br />