My WebLink
|
Help
|
About
|
Sign Out
Home
2016-02-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-02-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 1:51:13 PM
Creation date
2/18/2016 1:33:47 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/23/2016
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment D <br />Project Community Values Capability <br />This template must be used. The Contractor must identify its capability to meet the Community Values: <br />• Collection —which includes Clean and quiet; Impact on street (size and weight of trucks), Easy to <br />participate, Flexibility to Comingle, More materials picked up — particularly plastics, Materials are <br />efficiently recycled (local markets, highest and best use for material), Rewards for adding value, Multi- <br />family dwelling recycling <br />• Outreach —which includes Voluntary expansion to businesses, Effective frequent education of <br />residents— with measurement, Community involvement, Annual report that includes information on <br />what happens to material, Outreach to low participating communities, Outreach using electronic <br />communications <br />• Environmental Benefits — which includes Experience with Zero Waste events, Reduced carbon <br />footprint, Education and Leadership on Environmentally Preferred Purchasing (EPP), Local vendor - <br />terminal and MRF locations <br />The capability claims should be prioritized (list the most important claims first). The Contractor may add <br />or delete Project Capability Claim table templates, but do not exceed the two-page limit. Do NOT include <br />any identifying information in your Plan. Information listed under the "Documented Performance' line <br />may describe where the Contractor has used the approach or solution previously, and what the results <br />were in terms of verifiable metrics. <br />Community Values Capability 1 Claim: <br />Documented Performance: <br />Community Values Capability 2 Claim: <br />Documented Performance: <br />Community Values Capability 3 Claim: <br />Documented Performance: <br />Community Values Capability 4 Claim: <br />Documented Performance: <br />
The URL can be used to link to this page
Your browser does not support the video tag.