My WebLink
|
Help
|
About
|
Sign Out
Home
2016-03-02_PC_Agenda_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Planning Commission
>
Agendas and Packets
>
2016 Agendas
>
2016-03-02_PC_Agenda_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 4:29:30 PM
Creation date
4/8/2016 4:29:16 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Planning Commission
Commission/Committee - Document Type
Agenda/Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RPCA Attachment D <br />5. Cul-de-sac on Wheaton Ave. We responded that we did not prepare a cul-de-sac <br />concept of this site. The neighbors seem to support a cul-de-sac option vs. the <br />through street option. We explained that a proposed cul-de-sac on the east end of the <br />proposed Wheaton Ave. would exceed the City’s maximum cul-de-sac length of 500’. <br />6. Poor street drainage on the existing east end of Wheaton Ave. We responded that <br />our proposed street design for the extension of Wheaton Ave. to Dale St. N. would <br />resolve this existing drainage problem. <br />7. Home construction building times. We responded that our builders would be <br />required to meet the existing City requirements for allowable building days and <br />times. <br />8. Project schedule. We explained that the street and utility construction would <br />begin in Spring 2016, and be completed in Fall, 2016. The first homes could be <br />started in Summer, 2016, and the final homes could be completed by Fall, 2018. <br />Home construction would be subject to market demand. <br />9. Tree loss. We responded that the 12 lots on Wheaton Ave. would be custom <br />graded by the builders at the time of home construction. This will maximize the <br />number of existing trees that will be saved. We also explained that is project would <br />meet or exceed the City of Roseville’s tree preservation requirements. <br />Golden Valley Land Company <br />6001 Glenwood Ave. <br />Golden Valley, MN 55422 <br />(763-213-3944; Matt Pavek) <br />(612-309-9215; Peter Knaeble) <br />(mattpavek@gmail.com) <br />(peterknaeble@gmail.com) <br />Page 6 of 10 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.