Laserfiche WebLink
• Work on design will begin shortly with construction late fall or early spring of <br /> 2017. <br /> • Twin Lakes Area East Collector <br /> • Twin Lakes Area East Collector Improvements project(Attachment B)is being <br /> studied as an additional improvement related to the redevelopment of Twin Lakes <br /> Parkway. <br /> • Staff has been working with its consultant to come up with a preliminary design <br /> layout for the Twin Lakes East Collector. <br /> • On April 11, the Council authorized staff to proceed into final design. <br /> • In the near future staff will be holding a neighborhood meeting and completing <br /> the final design of the project. <br /> Minnesota Department of Transportation Projects; <br /> • Lexington Avenue Bridge Construction <br /> o Ramps closed as of April 18. <br /> o Lexington Avenue is scheduled to be closed beginning May 31. <br /> Metro Transit A Line BRT Project: <br /> • Construction is nearing completion on the stations along Snelling Ave at County Road B <br /> and Larpenteur(in Falcon Heights). A kick-off event for the start of BRT service has <br /> been scheduled for Saturday, June 1 lth. <br /> Major Maintenance Activities: <br /> • Spray patching potholes. <br /> • Sign maintenance. <br /> • Catch basin maintenance. <br /> • Repairing turf damage from plowing. <br /> • Turned compost at the compost site. <br /> • Removed snow plow equipment from trucks. <br /> • Hauled watermain break material. <br /> • Continue working on meter repairs. Approximately 45 meters remain to be upgraded to <br /> new meter and radio. <br /> • Cleaned the sanitary sewer lift stations. <br /> • Repaired three lift stations. <br /> • Collected bacteriological samples. <br /> • Continued with the 2016 sanitary sewer cleaning program by flushing dead end sewer <br /> mains. <br /> • Utilities staff attended sewer and water conferences to maintain licenses. <br /> Attachments: <br /> A: 2016 Project Map <br /> B: East Collector Location Map <br /> C: Preliminary Layout—East Collector <br /> D: Preliminary Layout, Lincoln Drive & Terrace Ave <br /> E: Preliminary Layout, Lincoln Drive & County Rd C-2 <br />